SW Loop Interconnect Project
From the ProvenHand pipeline wiki
SW Loop Interconnect Project is a natural gas facility project in Louisiana, operated by Natural Gas Pipeline Company of America LLC.
| SW Loop Interconnect Project | |
|---|---|
| General information | |
| Kind | Facility project[1] |
| Project type | Loop[2] |
| Commodity | Natural gas[3] |
| Owner and operator | |
| State | Louisiana[3] |
| Counties | Cameron[3] |
| FERC docket | CP10-438[2] |
| Technical information | |
| Capacity | deliver up to 200,000 Dth/day of natural gas[3] |
| Cost | $2,500,000[3] |
| On ProvenHand | |
| Hands listed | 0 |
SW Loop Interconnect Project is a natural gas facility project in Louisiana, operated by Natural Gas Pipeline Company of America LLC.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on SW Loop Interconnect Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “Notification of Variance, SW Loop Interconnect Project, Natural Gas Pipeline Company of America LLC (CP10-438)”. Natural Gas Pipeline Company of America LLC (filed with FERC). 23 November 2010. Retrieved 4 October 2026.
- “FERC eLibrary docket CP10-438”. Federal Energy Regulatory Commission. 20 May 2010. Retrieved 3 October 2026.
- “Notice of request under blanket authorization, Natural Gas Pipeline Company of America LLC (CP10-438)”. FERC. 28 May 2010. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.