Haltom City System

From the ProvenHand pipeline wiki

Haltom City System is an intrastate natural gas pipeline system in Texas, operated by Frost Brothers Pipeline, LLC.

Haltom City System
General information
CommodityNatural gas[1]
JurisdictionIntrastate[1]
Operator
StateTexas[1]
Texas RRC permit (T-4)07154[1]
Texas RRC system ID632633[1]
Technical information
Diameter6.63 in[1]
On ProvenHand
Hands listed0

Haltom City System is an intrastate natural gas pipeline system in Texas, operated by Frost Brothers Pipeline, LLC.

References

  1. “Railroad Commission of Texas: Pipeline Layers by County (digital map data)”. Railroad Commission of Texas. 3 October 2026. Retrieved 3 October 2026.
Haltom City System - ProvenHand Pipeline Wiki