Lobo Gathering System (NGL)

From the ProvenHand pipeline wiki

Lobo Gathering System (NGL) is an intrastate NGL pipeline system in Texas, operated by Enlink Permian, LLC.

Lobo Gathering System (NGL)
General information
CommodityNGL[1]
JurisdictionIntrastate[1]
StatusIn service[1]
Operator
StateTexas[1]
Texas RRC permit (T-4)09397[1]
Texas RRC system ID970827[1]
Technical information
Diameter6.63–8.63 in[1]
On ProvenHand
Hands listed0

Lobo Gathering System (NGL) is an intrastate NGL pipeline system in Texas, operated by Enlink Permian, LLC.

References

  1. “Railroad Commission of Texas: Pipeline Layers by County (digital map data)”. Railroad Commission of Texas. 3 October 2026. Retrieved 3 October 2026.
Lobo Gathering System (NGL) - ProvenHand Pipeline Wiki