Neumin Production Panther Reef Gathering System
From the ProvenHand pipeline wiki
Neumin Production Panther Reef Gathering System is an intrastate natural gas pipeline system in Texas, operated by Neumin Production Co..
| Neumin Production Panther Reef Gathering System | |
|---|---|
| General information | |
| Commodity | Natural gas[1] |
| Jurisdiction | Intrastate[1] |
| Operator | |
| State | Texas[1] |
| Texas RRC permit (T-4) | 02342[1] |
| Texas RRC system ID | 731655[1] |
| Technical information | |
| Diameter | 2.88–6.63 in[1] |
| On ProvenHand | |
| Hands listed | 0 |
Neumin Production Panther Reef Gathering System is an intrastate natural gas pipeline system in Texas, operated by Neumin Production Co..
References
- “Railroad Commission of Texas: Pipeline Layers by County (digital map data)”. Railroad Commission of Texas. 3 October 2026. Retrieved 3 October 2026.