Tarzan Compressor Station Project
From the ProvenHand pipeline wiki
Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.
Tarzan Compressor Station Project is a natural gas pipeline in Texas, operated by Northern Natural Gas Company. It was built and entered service in 2025.
| Tarzan Compressor Station Project | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | Expansion[2] or New build[3][sources disagree] |
| Status | In service[2][4] |
| Commodity | Natural gas[2] |
| Owner and operator | |
| State | Texas[2] |
| Counties | Andrews[3] |
| Construction started | 14 April 2025[5] |
| In service | 5 November 2025[2][4] |
| FERC docket | CP25-47[1] |
| Contractors | |
| Technical information | |
| Capacity | 87 MMcf/d additional capacity (EIA)[2] |
| Units added | 1 (gas turbine, 11,152 hp each)[3] |
| Horsepower added | 11,152 hp[3] |
| Cost | $36 million (EIA estimate; no dollar year given)[2] or $36.1 million[3][sources disagree] |
| On ProvenHand | |
| Hands listed | 0 |
Tarzan Compressor Station Project is a natural gas pipeline in Texas, operated by Northern Natural Gas Company. It was built and entered service in 2025.
Contractorsedit
| Contractor | Work | Scope |
|---|---|---|
| Ranger Plant Constructional Co.[4] | Prime | constructed the Tarzan compressor station (mechanical construction) |
| Taft Electrical[4] | Electrical and instrumentation | electrical installation at the Tarzan compressor station |
| Solar Turbines Inc.[4] | turbine commissioning and 100-hour run test | commissioned the turbine with Northern operations |
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
| Fact | Values given |
|---|---|
| Project type | |
| Cost |
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Tarzan Compressor Station Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC eLibrary docket CP25-47”. Federal Energy Regulatory Commission. 10 January 2025. Retrieved 3 October 2026.
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “Environmental Assessment Report for Northern Natural Gas Company's 157.205(b) and 157.208(b) – Prior Notice Filing under CP25-47.”. Federal Energy Regulatory Commission (staff document). 17 March 2025. Retrieved 3 October 2026.
- “Northern Natural Gas Company submits Weekly Environmental Inspector Report No. 30 for the period of 11/03/2025 to 11/09/2025 re the Tarzan Compressor Station Project under CP25-47.”. Northern Natural Gas Company (filed with FERC). 13 November 2025. Retrieved 3 October 2026.
- “Northern Natural Gas Company submits Bi-weekly Environmental Inspector Report No. 1 for the period of 04/14/2025 to 04/20/2025 re the Tarzan Compressor Station Project under CP25-47.”. Northern Natural Gas Company (filed with FERC). 24 April 2025. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.