TC Louisiana Intrastate Pipeline Project is a natural gas pipeline in Louisiana, operated by TC Louisiana Intrastate Pipeline LLC. It runs 39 miles.

TC Louisiana Intrastate Pipeline Project
Also calledGillis Access Project Extension[1]
General information
KindPipeline project[1]
Project typeExpansion[2] or Added units[3][sources disagree]
StatusApproved[2][3]
CommodityNatural gas[2][3]
Owner and operator
Operator
StateLouisiana[2]
CountiesBeauregard[3]
FERC docketCP26-33[1]
Technical information
Length39 mi[2]
Capacity1400 MMcf/d additional capacity (EIA)[2] or design capacity up to 1.9 billion cubic feet per day[3][sources disagree]
Units added1 × Solar Titan 250 (31,900 hp each)[3]
Horsepower added31,900 hp[3]
Cost$68.1 million[3]
On ProvenHand
Hands listed0

TC Louisiana Intrastate Pipeline Project is a natural gas pipeline in Louisiana, operated by TC Louisiana Intrastate Pipeline LLC. It runs 39 miles.

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Capacity
  • 1400 MMcf/d additional capacity (EIA)[2]
  • design capacity up to 1.9 billion cubic feet per day[3]
Project type

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on TC Louisiana Intrastate Pipeline Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC eLibrary docket CP26-33”. Federal Energy Regulatory Commission. 1 December 2025. Retrieved 3 October 2026.
  2. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  3. “Environmental Assessment Report for TC Louisiana Intrastate Pipeline LLC's Section 284.11(b) Advance Notification – Construction of Facilities under CP26-33.”. Federal Energy Regulatory Commission (staff document). 12 December 2025. Retrieved 3 October 2026.