TEAL Project

From the ProvenHand pipeline wiki

TEAL Project is a pipeline project, operated by Texas Eastern Transmission, LP. It runs 4.7 miles of 30", 36" pipe.

TEAL Project
General information
KindPipeline project[1]
Owner and operator
Facility project
Approved25 August 2017[3]
FERC docketCP16-23[3]
FERC pre-filing docketPF15-11[1]
Contractors
Technical information
Length4.7 mi[3]
Pipe size30", 36"[4]
Capacity950.16 MMcf/d (FERC project list)[3]
On ProvenHand
Hands listed0

TEAL Project is a pipeline project, operated by Texas Eastern Transmission, LP. It runs 4.7 miles of 30", 36" pipe.

Contractorsedit

ContractorWork
United Piping, Inc.[5]mechanical scope work (crews mechanically complete on TEAL scope in Ohio; scope not further specified)

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on TEAL Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC eLibrary docket CP16-23”. Federal Energy Regulatory Commission. 20 November 2015. Retrieved 3 October 2026.
  2. “Texas Eastern Transmission, LP post-construction noise survey, Salineville Compressor Station (CP16-23)”. Texas Eastern Transmission, LP (filed with FERC). 30 May 2019. Retrieved 4 October 2026.
  3. “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
  4. “Ongoing Projects: Construction Underway (Pipeline News, May 2017)”. Pipeline News. May 2017. Retrieved 3 October 2026.
  5. “United Piping operations snapshot: projects and crews”. United Piping, Inc. Archived from the original on 16 July 2019. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.