Tenneco Carthage Lateral Expansion
From the ProvenHand pipeline wiki
Tenneco Carthage Lateral Expansion is a natural gas pipeline in Louisiana and Texas, operated by Tennessee Gas Pipeline Company, L.L.C.. It entered service in 2009. It runs 1.1 miles of 12" pipe.
| Tenneco Carthage Lateral Expansion | |
|---|---|
| Also called | Carthage Expansion Project[1] |
| General information | |
| Kind | Pipeline project[2] |
| Project type | Lateral[2] or Expansion[1][sources disagree] |
| Status | In service[2] |
| Commodity | Natural gas[2] |
| Operator | |
| Owner and operator | |
| States | Louisiana, Texas[2] |
| Counties | DeSoto, Ouachita[3] |
| Approved | 14 August 2008[3] |
| In service | June 2009[2] |
| FERC docket | CP08-27[2] |
| Technical information | |
| Length | 1.1 mi[2] |
| Pipe size | 12"[2] |
| Capacity | 100 MMcf/d additional capacity (EIA)[2] |
| Capacity added | 100 MMcf/d (El Paso presentation, TGP Carthage Expansion)[4] |
| Cost | $42 million (EIA estimate; no dollar year given)[2] or approximately $38.5 million ($26.9 million expansion component, $11.6 million replacement component) (certificate order)[3][sources disagree] |
| On ProvenHand | |
| Hands listed | 0 |
Tenneco Carthage Lateral Expansion is a natural gas pipeline in Louisiana and Texas, operated by Tennessee Gas Pipeline Company, L.L.C.. It entered service in 2009. It runs 1.1 miles of 12" pipe.
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
| Fact | Values given |
|---|---|
| Project type | |
| Cost |
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Tenneco Carthage Lateral Expansion? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC eLibrary docket CP08-27”. Federal Energy Regulatory Commission. 14 November 2007. Retrieved 3 October 2026.
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “Order Issuing Certificate and Granting Abandonment, Tennessee Gas Pipeline Company, Carthage Expansion Project (CP08-27)”. FERC (order). 14 August 2008. Retrieved 4 October 2026.
- “El Paso Corporation investor presentation (Form 8-K, Exhibit 99.1), June 2009”. El Paso Corporation (SEC filing). 5 June 2009. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.