Tennessee Gas Pipeline Presidential Permit Amendment
From the ProvenHand pipeline wiki
Tennessee Gas Pipeline Presidential Permit Amendment is a natural gas pipeline expansion in Texas, operated by Tennessee Gas Pipeline Company, L.L.C.. It entered service in 2018. It runs 0.1 miles of 24" pipe.
| Tennessee Gas Pipeline Presidential Permit Amendment | |
|---|---|
| Also called | TGP Rio Bravo Hidalgo Expansion[1] |
| General information | |
| Kind | Pipeline project[2] |
| Project type | Expansion[1] |
| Status | In service[1] |
| Commodity | Natural gas[1] |
| Owner and operator | |
| State | Texas[1][2] |
| Approved | 5 July 2018[2] |
| In service | 5 July 2018[1] |
| FERC docket | CP18-35[2] |
| Technical information | |
| Length | 0.1 mi[1] |
| Pipe size | 24"[1] |
| Capacity | 283 MMcf/d (FERC project list)[2] or 383 MMcf/d additional capacity (EIA)[1][sources disagree] |
| On ProvenHand | |
| Hands listed | 0 |
Tennessee Gas Pipeline Presidential Permit Amendment is a natural gas pipeline expansion in Texas, operated by Tennessee Gas Pipeline Company, L.L.C.. It entered service in 2018. It runs 0.1 miles of 24" pipe.
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Tennessee Gas Pipeline Presidential Permit Amendment? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.