Tennessee Gas Pipeline Station 230C Project
From the ProvenHand pipeline wiki
Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.
Tennessee Gas Pipeline Station 230C Project is a natural gas pipeline in New York, operated by Tennessee Gas Pipeline Company, L.L.C.. It entered service in 2012.
| Tennessee Gas Pipeline Station 230C Project | |
|---|---|
| Also called | Station 230C Project[1], Station 230C - Niagara Spur Loop Line Project[2] |
| General information | |
| Kind | Pipeline project[1] |
| Project type | Expansion[1] or Loop[2][sources disagree] |
| Status | In service[1] |
| Commodity | Natural gas[1] |
| Operator | |
| Owner and operator | |
| State | New York[1] |
| Approved | 20 October 2011[3] |
| In service | 16 October 2012[1] |
| FERC docket | CP11-133[1] |
| Technical information | |
| Capacity | 320 MMcf/d additional capacity (EIA)[1] |
| Cost | $60 million (EIA estimate; no dollar year given)[1] or approximately $20,100,000 including contingency, overheads and AFUDC (estimate; $14.7 million allotted to National Fuel)[3][sources disagree] |
| On ProvenHand | |
| Hands listed | 0 |
Tennessee Gas Pipeline Station 230C Project is a natural gas pipeline in New York, operated by Tennessee Gas Pipeline Company, L.L.C.. It entered service in 2012.
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
| Fact | Values given |
|---|---|
| Project type | |
| Cost |
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Tennessee Gas Pipeline Station 230C Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “FERC eLibrary docket CP11-133”. Federal Energy Regulatory Commission. 9 March 2011. Retrieved 3 October 2026.
- “Order Issuing Certificates and Granting Abandonment, Northern Access Project (CP11-128) and Station 230C Project (CP11-133)”. Federal Energy Regulatory Commission. 20 October 2011. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.