TETCO Beauregard Interconnect Modifications & Compressor Booster Station Project
From the ProvenHand pipeline wiki
TETCO Beauregard Interconnect Modifications & Compressor Booster Station Project is a natural gas pipeline in Louisiana, operated by Trunkline Gas Company, LLC. It entered service in 2024.
| TETCO Beauregard Interconnect Modifications & Compressor Booster Station Project | |
|---|---|
| Also called | Compressor Booster Station Project[1] |
| General information | |
| Kind | Pipeline project[1] |
| Project type | Replacement[1] or Expansion[2][sources disagree] |
| Status | In service[2][3] |
| Commodity | Natural gas[2][4] |
| Owner and operator | |
| State | Louisiana[2][4] |
| Counties | Beauregard[4] |
| In service | 15 September 2024[2] |
| FERC docket | CP23-530[1] |
| Technical information | |
| Capacity | 100 MMcf/d additional capacity (EIA)[2] |
| Cost | $26,300,000[4] |
| On ProvenHand | |
| Hands listed | 0 |
TETCO Beauregard Interconnect Modifications & Compressor Booster Station Project is a natural gas pipeline in Louisiana, operated by Trunkline Gas Company, LLC. It entered service in 2024.
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on TETCO Beauregard Interconnect Modifications & Compressor Booster Station Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC eLibrary docket CP23-530”. Federal Energy Regulatory Commission. 18 August 2023. Retrieved 3 October 2026.
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “Weekly Environmental Status Report No. 55, final (Nov 2024), TETCO Beauregard Interconnect Modifications and Compressor Booster Station Project (CP23-530)”. Trunkline Gas Company, LLC (filed with FERC). 20 November 2024. Retrieved 4 October 2026.
- “Environmental Assessment Report, TETCO Beauregard Interconnect Modifications and Compressor Booster Station Project (CP23-530)”. FERC. 20 October 2023. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.