Tewksbury-Andover Lateral Project
From the ProvenHand pipeline wiki
Tewksbury-Andover Lateral Project is a natural gas pipeline lateral in Massachusetts, operated by Tennessee Gas Pipeline Company, L.L.C.. It entered service in 2005. It runs 5.3 miles of 8" pipe.
| Tewksbury-Andover Lateral Project | |
|---|---|
| Also called | Tenneco Tewksbury-Andover Lateral[1] |
| General information | |
| Kind | Pipeline project[1] |
| Project type | Lateral[2] |
| Status | In service[2] |
| Commodity | Natural gas[2] |
| Owner and operator | |
| State | Massachusetts[1][2] |
| Approved | 24 January 2005[1] |
| In service | 7 October 2005[2] |
| FERC docket | CP04-60[1] |
| Technical information | |
| Length | 5.3 mi[1][2] |
| Pipe size | 8"[2] |
| Capacity | 25 MMcf/d (FERC project list)[1][2] |
| Cost | $7.7 million (EIA estimate; no dollar year given)[2] |
| On ProvenHand | |
| Hands listed | 0 |
Tewksbury-Andover Lateral Project is a natural gas pipeline lateral in Massachusetts, operated by Tennessee Gas Pipeline Company, L.L.C.. It entered service in 2005. It runs 5.3 miles of 8" pipe.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Tewksbury-Andover Lateral Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.