Texas Access Project

From the ProvenHand pipeline wiki

Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.

Texas Access Project is a natural gas pipeline expansion in Louisiana and Texas, operated by Kinder Morgan Louisiana Pipeline Company LLC. It runs 3 miles of 48" pipe.

Texas Access Project
General information
KindPipeline project[1]
Project typeExpansion[2]
StatusProposed[2][3]
CommodityNatural gas[2][3]
Owner and operator
StatesLouisiana, Texas[2][3]
CountiesLouisiana: Calcasieu, Cameron
Texas: Jefferson
[3]
FERC docketCP26-136[1]
Technical information
Length3 mi[2][3][4]
Pipe size48 in[2] or 42 in, 48 in[3][sources disagree]
Capacity1300 MMcf/d additional capacity (EIA)[2] or up to 1,300,000 Dth/d from new Texas interconnections (no increase in KMLP's certificated design capacity)[3][sources disagree]
Cost$112 million (EIA estimate; no dollar year given)[2][4][5]
On ProvenHand
Hands listed0

Texas Access Project is a natural gas pipeline expansion in Louisiana and Texas, operated by Kinder Morgan Louisiana Pipeline Company LLC. It runs 3 miles of 48" pipe.

Crossings

FeatureMethod
Sabine-Neches Waterway (Mainline Extension)[3]HDD

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Capacity
  • 1300 MMcf/d additional capacity (EIA)[2]
  • up to 1,300,000 Dth/d from new Texas interconnections (no increase in KMLP's certificated design capacity)[3]
Diameters

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Texas Access Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC eLibrary docket CP26-136”. Federal Energy Regulatory Commission. 6 March 2026. Retrieved 3 October 2026.
  2. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  3. “Environmental Assessment for the Texas Access Project (CP26-136)”. Federal Energy Regulatory Commission. 18 September 2026. Retrieved 3 October 2026.
  4. “Abbreviated Application for a Certificate of Public Convenience and Necessity, Texas Access Project (CP26-136)”. Kinder Morgan Louisiana Pipeline LLC (filed with FERC). 6 March 2026. Retrieved 3 October 2026.
  5. “Texas Access Project”. Kinder Morgan, Inc. Retrieved 3 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.