Texas Eastern Transmission CP08-88
From the ProvenHand pipeline wiki
Texas Eastern Transmission CP08-88 is a natural gas facility project in Louisiana, operated by Texas Eastern Transmission, LP.
| Texas Eastern Transmission CP08-88 | |
|---|---|
| General information | |
| Kind | Facility project[1] |
| Commodity | Natural gas[2] |
| Owner and operator | |
| State | Louisiana[2] |
| Counties | Evangeline[2][3] |
| FERC docket | CP08-88[1] |
| Technical information | |
| Capacity | receive up to 500 MMcf of natural gas per day[2][3] |
| Cost | $2,109,396[2][3] |
| On ProvenHand | |
| Hands listed | 0 |
Texas Eastern Transmission CP08-88 is a natural gas facility project in Louisiana, operated by Texas Eastern Transmission, LP.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Texas Eastern Transmission CP08-88? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC eLibrary docket CP08-88”. Federal Energy Regulatory Commission. 7 March 2008. Retrieved 3 October 2026.
- “Notice of request under blanket authorization, Texas Eastern Transmission, LP (CP08-88)”. FERC. 13 March 2008. Retrieved 4 October 2026.
- “Texas Eastern Transmission, LP; Notice of Request Under Blanket Authorization (Docket No. CP08-88-000), Federal Register E8-5593”. Federal Energy Regulatory Commission (published in the Federal Register). 20 March 2008. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.