Texas Eastern Transmission CP21-456
From the ProvenHand pipeline wiki
Texas Eastern Transmission CP21-456 is a natural gas facility project, operated by Texas Eastern Transmission, LP.
| Texas Eastern Transmission CP21-456 | |
|---|---|
| General information | |
| Kind | Facility project[1] |
| Project type | Rebuild[1] |
| Commodity | Natural gas[2] |
| Owner and operator | |
| FERC docket | CP21-456[1] |
| On ProvenHand | |
| Hands listed | 0 |
Texas Eastern Transmission CP21-456 is a natural gas facility project, operated by Texas Eastern Transmission, LP.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Texas Eastern Transmission CP21-456? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC eLibrary docket CP21-456”. Federal Energy Regulatory Commission. 3 June 2021. Retrieved 3 October 2026.
- “Advance notification, auxiliary facilities, Bernville Compressor Units Replacement Project (filed in CP21-456, certificated in CP19-191)”. Texas Eastern Transmission, LP (filed with FERC). 3 June 2021. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.