Texas Eastern Transmission Line 16 Replacement Project

From the ProvenHand pipeline wiki

Texas Eastern Transmission Line 16 Replacement Project is a natural gas pipeline replacement in Texas, operated by Texas Eastern Transmission, LP.

Texas Eastern Transmission Line 16 Replacement Project
Also calledLine 16 Replacement Project[1]
General information
KindPipeline project[2]
Project typeReplacement[1][2]
CommodityNatural gas[1]
Owner and operator
StateTexas[1]
CountiesAransas, Refugio[1]
FERC docketCP15-497[2]
Technical information
Pipe size30"[1]
Cost$40 million[1]
On ProvenHand
Hands listed0

Texas Eastern Transmission Line 16 Replacement Project is a natural gas pipeline replacement in Texas, operated by Texas Eastern Transmission, LP.

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Texas Eastern Transmission Line 16 Replacement Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “Advance notification of Section 2.55(b) replacement activities and request for limited waiver, Line 16 Replacement Project (CP15-497)”. Texas Eastern Transmission, LP (filed with FERC). 22 May 2015. Retrieved 4 October 2026.
  2. “FERC eLibrary docket CP15-497”. Federal Energy Regulatory Commission. 22 May 2015. Retrieved 3 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.