Texas Gas Greenville Lateral
From the ProvenHand pipeline wiki
Texas Gas Greenville Lateral is a natural gas pipeline in Mississippi, operated by Texas Gas Transmission, LLC. It entered service in 2009. It runs 96.4 miles of 36" pipe.
| Texas Gas Greenville Lateral | |
|---|---|
| Also called | TGT Greenville Lateral[1] |
| General information | |
| Kind | Pipeline project[1] |
| Project type | New build[1] |
| Status | In service[1] |
| Commodity | Natural gas[1] |
| Operator | |
| State | Mississippi[1] |
| Approved | 2 May 2008[2] |
| In service | 27 March 2009[1] |
| FERC docket | CP07-417[1] |
| FERC pre-filing docket | PF07-2[1] |
| Technical information | |
| Length | 96.4 mi[1] |
| Pipe size | 36"[1] |
| Capacity | 768 MMcf/d additional capacity (EIA)[1] |
| Cost | $373.4 million (EIA estimate; no dollar year given)[1] |
| On ProvenHand | |
| Hands listed | 0 |
Texas Gas Greenville Lateral is a natural gas pipeline in Mississippi, operated by Texas Gas Transmission, LLC. It entered service in 2009. It runs 96.4 miles of 36" pipe.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Texas Gas Greenville Lateral? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “Order issuing certificate(s), docket CP07-417: Order issuing certificate re Texas Gas Transmission, LLC under CP07-417.”. Federal Energy Regulatory Commission. 2 May 2008. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.