Texas Gas Transmission CP15-491
From the ProvenHand pipeline wiki
Texas Gas Transmission CP15-491 is a natural gas facility project in Louisiana, operated by Texas Gas Transmission, LLC.
| Texas Gas Transmission CP15-491 | |
|---|---|
| General information | |
| Kind | Facility project[1] |
| Project type | Rebuild[1][2] |
| Commodity | Natural gas[2] |
| Owner and operator | |
| State | Louisiana[2] |
| Counties | Caldwell[2] |
| FERC docket | CP15-491[1] |
| Technical information | |
| Cost | $28.7 million[2] |
| On ProvenHand | |
| Hands listed | 0 |
Texas Gas Transmission CP15-491 is a natural gas facility project in Louisiana, operated by Texas Gas Transmission, LLC.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Texas Gas Transmission CP15-491? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC eLibrary docket CP15-491”. Federal Energy Regulatory Commission. 13 May 2015. Retrieved 3 October 2026.
- “Advance notification of natural gas facility replacement, Columbia Compressor Station, Texas Gas Transmission, LLC (CP15-491)”. Texas Gas Transmission, LLC (filed with FERC). 13 May 2015. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.