Texas Gas Transmission Texas Gas storage Expansion Project

From the ProvenHand pipeline wiki

Texas Gas Transmission Texas Gas storage Expansion Project is a natural gas facility project in Kentucky, operated by Texas Gas Transmission, LLC. It entered service in 2007.

Texas Gas Transmission Texas Gas storage Expansion Project
General information
KindFacility project[1]
Project typeExpansion[1][2]
StatusIn service[3]
CommodityNatural gas[2]
Owner and operator
StateKentucky[2]
CountiesHopkins, Muhlenberg, Webster[2]
Approved4 December 2006[2]
In service4 December 2007[3]
FERC docketCP06-126[1]
Technical information
Units added1 × Solar Mars (gas turbine, 13,338 hp each); 2 × Caterpillar 3606TALE (gas-driven reciprocating engine, 1,775 hp each)[2]
Horsepower added16,888 hp[2]
Cost$36,263,100[2]
On ProvenHand
Hands listed0

Texas Gas Transmission Texas Gas storage Expansion Project is a natural gas facility project in Kentucky, operated by Texas Gas Transmission, LLC. It entered service in 2007.

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Texas Gas Transmission Texas Gas storage Expansion Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC eLibrary docket CP06-126”. Federal Energy Regulatory Commission. 14 April 2006. Retrieved 3 October 2026.
  2. “Order issuing certificate and granting abandonment authority, Texas Gas Transmission (Texas Gas Storage Expansion Project - Phase 2, CP06-126)”. Federal Energy Regulatory Commission. 4 December 2006. Retrieved 4 October 2026.
  3. “Certification that the Hanson Compressor Station segment was placed in service 12/4/07 (CP06-126)”. Federal Energy Regulatory Commission. 6 December 2007. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.