Texas Gateway Pipeline Project

From the ProvenHand pipeline wiki

Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.

Texas Gateway Pipeline Project is a natural gas pipeline expansion in Louisiana and Texas, operated by Gulf South Pipeline Company, LLC.

Texas Gateway Pipeline Project
General information
KindPipeline project[1]
Project typeExpansion[2]
StatusProposed[2][3]
CommodityNatural gas[2][3]
Owner and operator
Facility projects
StatesLouisiana, Texas[2][3]
CountiesLouisiana: Beauregard
Texas: Jasper, Newton, Panola, Sabine, San Augustine, San Jacinto, Shelby
[3]
FERC docketCP26-547[1]
Technical information
Length155 mi[2] or 153.6 mi[4][sources disagree]
Pipe size36", 42"[2][4]
Capacity1450 MMcf/d additional capacity (EIA)[2]
Capacity added1,800,000 Dth/d to the Gillis Hub, incl. 1,200,000 Dth/d of new pipeline capacity[4]
Cost$1,475,826.1 thousand (Exhibit K): $1.40 billion Gateway pipeline facilities plus $75.5 million Cleveland CS[4]
On ProvenHand
Hands listed0

Texas Gateway Pipeline Project is a natural gas pipeline expansion in Louisiana and Texas, operated by Gulf South Pipeline Company, LLC.

Spreads

Spread
Single spread[4]

Crossings

FeatureMethod
Beckwith Creek (HDD-11, MP 135.93-136.34)[4]HDD
Big Cow Creek (HDD-08, MP 110.31-109.83)[4]HDD
Hickory Branch (HDD-12, MP 147.05-146.71)[4]HDD
Old River (HDD-10, MP 122.64-122.26)[4]HDD
Railroad and USACE property (HDD-07, MP 76.86-77.22)[4]HDD
Sabine River (HDD-09, MP 119.79-120.57)[4]HDD
Sensitive habitat for federally listed species and highway crossing (HDD-03, MP 47.56-48.10)[4]HDD
Ware Farm (HDD-02, MP 42.59-43.05)[4]HDD
Wetlands/waterbodies and U.S. Forest Service property (HDD-06, MP 76.10-76.69)[4]HDD
Wetlands/waterbodies and U.S. Forest Service/USACE property (HDD-05, MP 74.45-75.18)[4]HDD

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Length

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Texas Gateway Pipeline Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC eLibrary docket CP26-547”. Federal Energy Regulatory Commission. 25 June 2026. Retrieved 3 October 2026.
  2. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  3. “Notice of Intent to Prepare an Environmental Impact Statement for the Proposed Texas Gateway Project (CP26-547)”. Federal Energy Regulatory Commission. 25 August 2026. Retrieved 3 October 2026.
  4. “Abbreviated Application for a Certificate of Public Convenience and Necessity, Texas Gateway Project (CP26-547): application and Exhibit K, Resource Report 1, and Appendix 9 air permit applications”. Gulf South Pipeline Company, LLC (filed with FERC). 26 June 2026. Retrieved 3 October 2026.
  5. “Boardwalk's Texas Gateway Project to Deliver Reliable Natural Gas to the Gulf Coast”. Boardwalk Pipelines, LP. 30 October 2025. Retrieved 3 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.