Texas Gateway Pipeline Project
From the ProvenHand pipeline wiki
Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.
Texas Gateway Pipeline Project is a natural gas pipeline expansion in Louisiana and Texas, operated by Gulf South Pipeline Company, LLC.
| Texas Gateway Pipeline Project | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | Expansion[2] |
| Status | Proposed[2][3] |
| Commodity | Natural gas[2][3] |
| Owner and operator | |
| Facility projects | |
| States | Louisiana, Texas[2][3] |
| Counties | Louisiana: Beauregard Texas: Jasper, Newton, Panola, Sabine, San Augustine, San Jacinto, Shelby[3] |
| FERC docket | CP26-547[1] |
| Technical information | |
| Length | 155 mi[2] or 153.6 mi[4][sources disagree] |
| Pipe size | 36", 42"[2][4] |
| Capacity | 1450 MMcf/d additional capacity (EIA)[2] |
| Capacity added | 1,800,000 Dth/d to the Gillis Hub, incl. 1,200,000 Dth/d of new pipeline capacity[4] |
| Cost | $1,475,826.1 thousand (Exhibit K): $1.40 billion Gateway pipeline facilities plus $75.5 million Cleveland CS[4] |
| On ProvenHand | |
| Hands listed | 0 |
Texas Gateway Pipeline Project is a natural gas pipeline expansion in Louisiana and Texas, operated by Gulf South Pipeline Company, LLC.
Spreads
| Spread |
|---|
| Single spread[4] |
Crossings
| Feature | Method |
|---|---|
| Beckwith Creek (HDD-11, MP 135.93-136.34)[4] | HDD |
| Big Cow Creek (HDD-08, MP 110.31-109.83)[4] | HDD |
| Hickory Branch (HDD-12, MP 147.05-146.71)[4] | HDD |
| Old River (HDD-10, MP 122.64-122.26)[4] | HDD |
| Railroad and USACE property (HDD-07, MP 76.86-77.22)[4] | HDD |
| Sabine River (HDD-09, MP 119.79-120.57)[4] | HDD |
| Sensitive habitat for federally listed species and highway crossing (HDD-03, MP 47.56-48.10)[4] | HDD |
| Ware Farm (HDD-02, MP 42.59-43.05)[4] | HDD |
| Wetlands/waterbodies and U.S. Forest Service property (HDD-06, MP 76.10-76.69)[4] | HDD |
| Wetlands/waterbodies and U.S. Forest Service/USACE property (HDD-05, MP 74.45-75.18)[4] | HDD |
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Texas Gateway Pipeline Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC eLibrary docket CP26-547”. Federal Energy Regulatory Commission. 25 June 2026. Retrieved 3 October 2026.
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “Notice of Intent to Prepare an Environmental Impact Statement for the Proposed Texas Gateway Project (CP26-547)”. Federal Energy Regulatory Commission. 25 August 2026. Retrieved 3 October 2026.
- “Abbreviated Application for a Certificate of Public Convenience and Necessity, Texas Gateway Project (CP26-547): application and Exhibit K, Resource Report 1, and Appendix 9 air permit applications”. Gulf South Pipeline Company, LLC (filed with FERC). 26 June 2026. Retrieved 3 October 2026.
- “Boardwalk's Texas Gateway Project to Deliver Reliable Natural Gas to the Gulf Coast”. Boardwalk Pipelines, LP. 30 October 2025. Retrieved 3 October 2026.