Texas LNG Brownsville
From the ProvenHand pipeline wiki
Texas LNG Brownsville is a facility project at Texas LNG in Texas, operated by Texas LNG Brownsville LLC.
| Texas LNG Brownsville | |
|---|---|
| Also called | Texas LNG Liquefaction Project[1] |
| General information | |
| Kind | Facility project[2] |
| Project type | New build[3] |
| Status | Approved[2] |
| Owner | |
| Owner and operator | |
| Facility | Texas LNG[2] |
| State | Texas[2] |
| Counties | Cameron[3] |
| Approved | 22 November 2019[3] |
| FERC docket | CP16-116[2] |
| FERC pre-filing docket | PF15-14[4] |
| Doe lng docket | 15-62-LNG[5] |
| Contractors | |
| Technical information | |
| Capacity added | 0.62 Bcfd (FERC LNG map, Sep 2026)[2] |
| LNG trains added | 2[3] |
| Liquefaction added | 4 MTPA[3] |
| On ProvenHand | |
| Hands listed | 0 |
Texas LNG Brownsville is a facility project at Texas LNG in Texas, operated by Texas LNG Brownsville LLC.
Contractorsedit
| Contractor | Work | Prime or sub | Scope |
|---|---|---|---|
| Kiewit Energy Group Inc.[1][6] | Prime | Lump-sum turnkey EPC contract executed 2026-03-05 for engineering, procurement, module fabrication, construction and commissioning of the full terminal; construction not begun as of Aug 2026 | |
| Kiewit Offshore Services[7] | Fabrication | Under Kiewit Energy Group Inc. | Named to fabricate the liquefaction, pretreatment and pipe rack modules at Ingleside, Texas once notice to proceed is given |
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Texas LNG Brownsville? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “Monthly Status Report No. 80 (August 2026), Texas LNG Liquefaction Project (CP16-116)”. Texas LNG Brownsville LLC (filed with FERC). 28 September 2026. Retrieved 3 October 2026.
- “FERC: U.S. LNG export terminals (as of September 22, 2026)”. Federal Energy Regulatory Commission. 22 September 2026. Retrieved 3 October 2026.
- “Order on Remand and Granting Extension of Time Request, Texas LNG Brownsville LLC (CP16-116)”. Federal Energy Regulatory Commission. 21 August 2025. Retrieved 3 October 2026.
- “FERC eLibrary docket CP16-116”. Federal Energy Regulatory Commission. 31 March 2016. Retrieved 3 October 2026.
- “DOE: Long Term Applications Received by DOE to Export Domestically Produced LNG, CNG, CGL from the Lower-48 States (as of September 30, 2026)”. U.S. Department of Energy, Office of Fossil Energy and Carbon Management. 30 September 2026. Retrieved 3 October 2026.
- “Texas LNG and Kiewit sign EPC contract”. LNG Industry. 10 March 2026. Retrieved 3 October 2026.
- “Texas LNG semi-annual progress report to DOE, October 2025 to March 2026”. Texas LNG Brownsville LLC (filed with the U.S. Department of Energy). Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.