TGT Fayetteville Lateral Phase 1
From the ProvenHand pipeline wiki
TGT Fayetteville Lateral Phase 1 is a natural gas pipeline in Arkansas, operated by Texas Gas Transmission, LLC. It entered service in 2008. It runs 66 miles of 18", 36" pipe.
| TGT Fayetteville Lateral Phase 1 | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | New build[1] |
| Status | In service[1] |
| Commodity | Natural gas[1] |
| Operator | |
| State | Arkansas[1] |
| Approved | 2 May 2008[2] |
| In service | 24 December 2008[1] |
| FERC docket | CP07-417[1] |
| FERC pre-filing docket | PF07-2[1] |
| Technical information | |
| Length | 66 mi[1] |
| Pipe size | 18", 36"[1] |
| Capacity | 967 MMcf/d additional capacity (EIA)[1] |
| Cost | $205 million (EIA estimate; no dollar year given)[1] |
| On ProvenHand | |
| Hands listed | 0 |
TGT Fayetteville Lateral Phase 1 is a natural gas pipeline in Arkansas, operated by Texas Gas Transmission, LLC. It entered service in 2008. It runs 66 miles of 18", 36" pipe.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on TGT Fayetteville Lateral Phase 1? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “Order issuing certificate(s), docket CP07-417: Order issuing certificate re Texas Gas Transmission, LLC under CP07-417.”. Federal Energy Regulatory Commission. 2 May 2008. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.