TGT Fayetteville Lateral Phase 2

From the ProvenHand pipeline wiki

TGT Fayetteville Lateral Phase 2 is a natural gas pipeline in Arkansas and Mississippi, operated by Texas Gas Transmission, LLC. It entered service in 2009. It runs 166.2 miles of 36" pipe.

TGT Fayetteville Lateral Phase 2
General information
KindPipeline project[1]
Project typeNew build[1]
StatusIn service[1]
CommodityNatural gas[1]
Operator
StatesArkansas, Mississippi[1]
Approved2 May 2008[2]
In service27 March 2009[1]
FERC docketCP07-417[1]
FERC pre-filing docketPF07-2[1]
Technical information
Length166.2 mi[1]
Pipe size36"[1]
Capacity967 MMcf/d additional capacity (EIA)[1]
Cost$670.9 million (EIA estimate; no dollar year given)[1]
On ProvenHand
Hands listed0

TGT Fayetteville Lateral Phase 2 is a natural gas pipeline in Arkansas and Mississippi, operated by Texas Gas Transmission, LLC. It entered service in 2009. It runs 166.2 miles of 36" pipe.

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on TGT Fayetteville Lateral Phase 2? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  2. “Order issuing certificate(s), docket CP07-417: Order issuing certificate re Texas Gas Transmission, LLC under CP07-417.”. Federal Energy Regulatory Commission. 2 May 2008. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.