TGT Midland Storage Lateral Exp
From the ProvenHand pipeline wiki
Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.
TGT Midland Storage Lateral Exp is a natural gas pipeline in Kentucky, operated by Texas Gas Transmission, LLC. It runs 11 miles of 30" pipe.
| TGT Midland Storage Lateral Exp | |
|---|---|
| Also called | Midland Storage Expansion Project[1], Texas Gas Storage Expansion Project - Phase 3[2] |
| General information | |
| Kind | Pipeline project[3] |
| Project type | Lateral[3] or Expansion[1][sources disagree] |
| Status | In service[3] |
| Commodity | Natural gas[3] |
| Operator | |
| Owner and operator | |
| State | Kentucky[3] |
| Counties | Muhlenberg[4] |
| Approved | 29 February 2008[4] |
| In service | October 2009[3] or 1 October 2009[2][sources disagree] |
| FERC docket | CP07-405[3] |
| Technical information | |
| Length | 11 mi[3] |
| Pipe size | 30"[3] |
| Capacity | 92 MMcf/d additional capacity (EIA)[3] |
| Units added | 1 × Solar Centaur 50 (gas turbine)[2] |
| Cost | $6.3 million (EIA estimate; no dollar year given)[3] |
| On ProvenHand | |
| Hands listed | 0 |
TGT Midland Storage Lateral Exp is a natural gas pipeline in Kentucky, operated by Texas Gas Transmission, LLC. It runs 11 miles of 30" pipe.
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on TGT Midland Storage Lateral Exp? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC eLibrary docket CP07-405”. Federal Energy Regulatory Commission. 25 June 2007. Retrieved 3 October 2026.
- “Notice of Commencement of Service of Second Phase Facilities, Texas Gas Storage Expansion Project - Phase 3 (CP07-405)”. Texas Gas Transmission, LLC (filed with FERC). 8 October 2009. Retrieved 4 October 2026.
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “Order Issuing Certificate and Granting Abandonment Authority, Texas Gas Transmission, LLC (CP07-405)”. Federal Energy Regulatory Commission. 29 February 2008. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.