TIME II Project is a natural gas pipeline in Ohio and Pennsylvania, operated by Texas Eastern Transmission, LP. It entered service in 2008. It runs 31.9 miles of 36" pipe.
| TIME II Project | |
|---|---|
| Also called | Texas Eastern Incremental Market Expansion Project[1] |
| General information | |
| Kind | Pipeline project[2] |
| Project type | Expansion[1] or Replacement[3][sources disagree] |
| Status | In service[4] |
| Commodity | Natural gas[3] |
| Owner and operator | |
| States | Ohio, Pennsylvania[2][3] |
| Approved | 8 June 2007[2][3] |
| In service | November 2008[4] |
| FERC docket | CP06-115[2] |
| Technical information | |
| Length | 31.9 mi[2] |
| Pipe size | 36"[3] |
| Capacity | 150 MMcf/d (FERC project list)[2] |
| Units added | 2 (electric motor, 16,000 hp each)[3] |
| Horsepower added | 32,000 hp[3] |
| On ProvenHand | |
| Hands listed | 0 |
TIME II Project is a natural gas pipeline in Ohio and Pennsylvania, operated by Texas Eastern Transmission, LP. It entered service in 2008. It runs 31.9 miles of 36" pipe.
Pipe mills
| Mill | Diameter | Grade | Years |
|---|---|---|---|
| Berg Pipe Panama City Corp.[5] | 36 in | X70 | 1 January 2008 |
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on TIME II Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC eLibrary docket CP06-115”. Federal Energy Regulatory Commission. 4 April 2006. Retrieved 3 October 2026.
- “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
- “Order issuing certificate(s), docket CP06-115: Order issuing certificate and granting abandonment authority re Texas Eastern Transmission”. Federal Energy Regulatory Commission. 8 June 2007. Retrieved 4 October 2026.
- “Verification of the Notice of Commencement of Service for the 2008 Facilities of the TIME II Project (CP06-115)”. Federal Energy Regulatory Commission. 13 November 2008. Retrieved 4 October 2026.
- “Project List (BSPC Reference List), bergpipe.com, 2009 capture”. Berg Steel Pipe Corp. (Berg Pipe). Archived from the original on 16 July 2009. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.