TIME II Project

From the ProvenHand pipeline wiki

Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.

TIME II Project is a natural gas pipeline in Ohio and Pennsylvania, operated by Texas Eastern Transmission, LP. It entered service in 2008. It runs 31.9 miles of 36" pipe.

TIME II Project
Also calledTexas Eastern Incremental Market Expansion Project[1]
General information
KindPipeline project[2]
Project typeExpansion[1] or Replacement[3][sources disagree]
StatusIn service[4]
CommodityNatural gas[3]
Owner and operator
StatesOhio, Pennsylvania[2][3]
Approved8 June 2007[2][3]
In serviceNovember 2008[4]
FERC docketCP06-115[2]
Technical information
Length31.9 mi[2]
Pipe size36"[3]
Capacity150 MMcf/d (FERC project list)[2]
Units added2 (electric motor, 16,000 hp each)[3]
Horsepower added32,000 hp[3]
On ProvenHand
Hands listed0

TIME II Project is a natural gas pipeline in Ohio and Pennsylvania, operated by Texas Eastern Transmission, LP. It entered service in 2008. It runs 31.9 miles of 36" pipe.

Pipe mills

MillDiameterGradeYears
Berg Pipe Panama City Corp.[5]36 inX701 January 2008

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Project type

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on TIME II Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC eLibrary docket CP06-115”. Federal Energy Regulatory Commission. 4 April 2006. Retrieved 3 October 2026.
  2. “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
  3. “Order issuing certificate(s), docket CP06-115: Order issuing certificate and granting abandonment authority re Texas Eastern Transmission”. Federal Energy Regulatory Commission. 8 June 2007. Retrieved 4 October 2026.
  4. “Verification of the Notice of Commencement of Service for the 2008 Facilities of the TIME II Project (CP06-115)”. Federal Energy Regulatory Commission. 13 November 2008. Retrieved 4 October 2026.
  5. “Project List (BSPC Reference List), bergpipe.com, 2009 capture”. Berg Steel Pipe Corp. (Berg Pipe). Archived from the original on 16 July 2009. Retrieved 3 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.