TM7-Loop Make Piggable Project - MOD Point 12 is a pipeline project in West Virginia, operated by Columbia Gas Transmission, LLC. Construction began in 2026.

TM7-Loop Make Piggable Project - MOD Point 12
General information
KindPipeline project[1]
StatusUnder construction[2]
Owner and operator
StateWest Virginia[1]
CountiesKanawha[3]
Approved9 July 2025[1]
Construction startedFebruary 2026[4]
FERC docketCP25-536[3]
West Virginia stormwater permitWVR312490[1]
On ProvenHand
Hands listed0

TM7-Loop Make Piggable Project - MOD Point 12 is a pipeline project in West Virginia, operated by Columbia Gas Transmission, LLC. Construction began in 2026.

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on TM7-Loop Make Piggable Project - MOD Point 12? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “WVDEP: Oil and Gas Construction Stormwater registrations”. West Virginia Department of Environmental Protection. Retrieved 3 October 2026.
  2. “Weekly Construction Status Report No. 47, TM7 Loop Piggable Project (CP25-536)”. Columbia Gas Transmission, LLC (filed with FERC). 28 September 2026. Retrieved 3 October 2026.
  3. “Prior Notice Request, TM7 Loop Piggable Project (CP25-536)”. Columbia Gas Transmission, LLC (filed with FERC). 12 August 2025. Retrieved 3 October 2026.
  4. “Weekly Construction Status Report No. 17, TM7 Loop Piggable Project (CP25-536), period 02/11/2026 to 02/17/2026”. Columbia Gas Transmission, LLC (filed with FERC). 26 February 2026. Retrieved 3 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.