TM7 Loop Piggable Project
From the ProvenHand pipeline wiki
TM7 Loop Piggable Project is a pipeline loop, operated by Columbia Gas Transmission, LLC.
| TM7 Loop Piggable Project | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | Loop[1] |
| Status | Under construction[2] |
| Owner and operator | |
| Counties | Calhoun, Gilmer, Kanawha, Roane[3] |
| Approved | 21 October 2025[4] |
| FERC docket | CP25-536[1] |
| Technical information | |
| Cost | $27,000,000[3] |
| On ProvenHand | |
| Hands listed | 0 |
TM7 Loop Piggable Project is a pipeline loop, operated by Columbia Gas Transmission, LLC.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on TM7 Loop Piggable Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC eLibrary docket CP25-536”. Federal Energy Regulatory Commission. 12 August 2025. Retrieved 3 October 2026.
- “Weekly Construction Status Report No. 47, TM7 Loop Piggable Project (CP25-536)”. Columbia Gas Transmission, LLC (filed with FERC). 28 September 2026. Retrieved 3 October 2026.
- “Environmental Assessment Report, Sections 157.205 and 157.208 Prior Notice Request, TM7-Loop Piggable Project (CP25-536)”. Federal Energy Regulatory Commission. 20 October 2025. Retrieved 3 October 2026.
- “Columbia Gas Transmission, LLC submits Weekly Status Report No. 1 for the period of 10/22/2025 to 10/28/2025 re the TM7 Loop Piggable Project under CP25-536.”. Columbia Gas Transmission, LLC (filed with FERC). 7 November 2025. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.