TP-4555 Bare Pipe Replacement Project
From the ProvenHand pipeline wiki
TP-4555 Bare Pipe Replacement Project is a natural gas pipeline replacement in Pennsylvania, operated by Equitrans, L.P.. Construction began in 2020. It runs 3.9 miles.
| TP-4555 Bare Pipe Replacement Project | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | Replacement[1] |
| Commodity | Natural gas[2] |
| Owner and operator | |
| State | Pennsylvania[2] |
| Counties | Westmoreland[2] |
| Construction started | 12 May 2020[3] |
| FERC docket | CP19-218[1] |
| Contractors | |
| Technical information | |
| Length | 3.9 mi[2] |
| On ProvenHand | |
| Hands listed | 0 |
TP-4555 Bare Pipe Replacement Project is a natural gas pipeline replacement in Pennsylvania, operated by Equitrans, L.P.. Construction began in 2020. It runs 3.9 miles.
Contractorsedit
| Contractor | Work | Scope |
|---|---|---|
| Frontier Environmental Services[3] | Prime | Named as the pipeline contractor in Equitrans' weekly environmental inspector report no. 1 (mobilized May 11, 2020; official construction start May 12, 2020) |
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on TP-4555 Bare Pipe Replacement Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC eLibrary docket CP19-218”. Federal Energy Regulatory Commission. 24 April 2019. Retrieved 3 October 2026.
- “Equitrans, L.P.; Notice of Request Under Blanket Authorization (CP19-218)”. Federal Energy Regulatory Commission (Federal Register notice). 13 May 2019. Retrieved 4 October 2026.
- “Weekly environmental inspector report no. 1, TP-4555 Bare Pipe Replacement Project (CP19-218)”. Equitrans, L.P. (filed with FERC). 15 May 2020. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.