Trailblazer Pipeline CP18-104 is a natural gas pipeline replacement in Colorado and Nebraska, operated by Trailblazer Pipeline Company LLC. It runs 5.8 miles of 36" pipe.
| Trailblazer Pipeline CP18-104 | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | Replacement[2] |
| Commodity | Natural gas[2] |
| Owner and operator | |
| States | Colorado, Nebraska[2] |
| Counties | Colorado: Logan Nebraska: Lincoln[2] |
| FERC docket | CP18-104[1] |
| Technical information | |
| Length | 5.8 mi[2] |
| Pipe size | 36"[2] |
| Cost | $13,265,500[2] |
| On ProvenHand | |
| Hands listed | 0 |
Trailblazer Pipeline CP18-104 is a natural gas pipeline replacement in Colorado and Nebraska, operated by Trailblazer Pipeline Company LLC. It runs 5.8 miles of 36" pipe.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Trailblazer Pipeline CP18-104? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC eLibrary docket CP18-104”. Federal Energy Regulatory Commission. 6 March 2018. Retrieved 3 October 2026.
- “30-day advance notification under 18 CFR 2.55(b), pipe replacement in Logan County CO and Lincoln County NE (CP18-104)”. Trailblazer Pipeline Company LLC (filed with FERC). 6 March 2018. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.