Trans-Pecos Pipeline
From the ProvenHand pipeline wiki
Trans-Pecos Pipeline is a natural gas pipeline in Texas, operated by Energy Transfer. Construction began in 2016 and the line entered service in 2017. It runs 143 miles of 42" pipe.[1]
| Trans-Pecos Pipeline | |
|---|---|
| Also called | Trans-Pecos, Presidio pipeline |
| General information | |
| Commodity | Natural gas |
| Operator | Energy Transfer |
| Facility project | |
| State | Texas |
| Construction started | 2016 |
| In service | 2017 |
| Contractors | |
| Technical information | |
| Length | 143 mi |
| Pipe size | 42"[7] |
| On ProvenHand | |
| Hands listed | 0 |
Trans-Pecos Pipeline is a natural gas pipeline in Texas, operated by Energy Transfer. Construction began in 2016 and the line entered service in 2017. It runs 143 miles of 42" pipe.[1]
Contractorsedit
| Contractor | Work | Scope | Years |
|---|---|---|---|
| Pumpco[3] | builder of the pipeline (NBC News); Pumpco lists a 2016 Energy Transfer 42-inch job from Coyanosa to Presidio, TX, as 'Waha Pipeline' | ||
| Pumpco, Inc.[7][8] | Prime | Listed as Trans Pecos Pipeline, LLC: 142.9 miles of 42-inch, 0.600-inch wall (Coyanosa, TX to Presidio, TX); page gives a projected completion of March 2017 | from 1 July 2016 |
| Pumpco, Inc.[9] | Prime | IIR listing: Energy Transfer awards MasTec (construction coordinator) and Pumpco (G/C) on the 143-mile 42-inch Trans-Pecos line, Waha Hub to Presidio, TX; construction commenced Jan/Mar 2016, completion 21 Mar 2017 | until 1 March 2017 |
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Trans-Pecos Pipeline? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- sec.gov · ete12-31x201510k.htm
- sec.gov · ete12-31x201710k.htm
- nbcnews.com
- pumpco.cc
- eia.gov · EIA-NaturalGasPipelineProjects.xlsx
- “Order Issuing Presidential Permit and Granting Authorization Under Section 3 of the Natural Gas Act, Trans-Pecos Pipeline, LLC, Docket No. CP15-500-000”. Federal Energy Regulatory Commission. 5 May 2016. Retrieved 4 October 2026.
- “Ongoing Projects: Construction Underway (Pipeline News, March 2017)”. Pipeline News. March 2017. Retrieved 3 October 2026.
- “WAHA 42" 340 Miles - Pumpco”. Pumpco, Inc. Archived from the original on 10 August 2020. Retrieved 3 October 2026.
- “Industrial Info Resources project report on the Whistler grassroot natural gas pipeline (Exhibit GPLDC-1b, South Dakota PUC docket HP22-001)”. Industrial Info Resources (as filed with the South Dakota Public Utilities Commission). 2023. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.