Transco Hillabee Expansion is a natural gas pipeline in Alabama, operated by Williams (Transco). Construction began in 2016 and the line entered service in 2020. It runs 43.6 miles of 42", 48" pipe.[1]
| Transco Hillabee Expansion | |
|---|---|
| Also called | Hillabee Expansion Project, Hillabee |
| General information | |
| Commodity | Natural gas |
| Operator | Williams (Transco) |
| State | Alabama |
| Construction started | 2016 |
| In service | 2020 |
| Contractors |
|
| Technical information | |
| Length | 43.6 mi |
| Pipe size | 42", 48" |
| On ProvenHand | |
| Hands listed | 0 |
Transco Hillabee Expansion is a natural gas pipeline in Alabama, operated by Williams (Transco). Construction began in 2016 and the line entered service in 2020. It runs 43.6 miles of 42", 48" pipe.[1]
Contractorsedit
| Contractor | Scope |
|---|---|
| Price Gregory[3] | Phase I loops (5 mi of 48-inch, 15 mi of 42-inch, 2016-2017) and Phase II (10.3 mi of 42-inch, 2019) |
Referencesedit
- nsenergybusiness.com
- worldpipelines.com
- pricegregory.com · Price-Gregory-Completed-Pipeline-Project
- industrialinfo.com
- eia.gov · EIA-NaturalGasPipelineProjects.xlsx
This pipeline article is a stub. You can help ProvenHand by expanding it.