Transco Hillabee Expansion is a natural gas pipeline expansion in Alabama. Construction began in 2016 and the line entered service in 2020.[1]

Transco Hillabee Expansion
Also calledHillabee Expansion Project[6], Hillabee, Hillabee Expansion Proj[7]
General information
Project typeExpansion[6][8]
CommodityNatural gas
OperatorWilliams (Transco)[7] or Transcontinental Gas Pipe Line Company, LLC[7][sources disagree]
Owner and operator
StateAlabama[7]
CountiesChilton, Choctaw, Coosa[9]
Approved2 February 2016[7]
Construction started24 August 2016[10]
In service2020
FERC docketsCP15-16[7], CP19-161[6]
FERC pre-filing docketPF14-6[7]
Contractors
Technical information
Length43.6 mi[7] or 43.5 mi[7][sources disagree]
Pipe size42", 48"
Capacity1131.7 MMcf/d (FERC project list)[7]
On ProvenHand
Hands listed0

Transco Hillabee Expansion is a natural gas pipeline expansion in Alabama. Construction began in 2016 and the line entered service in 2020.[1]

Contractorsedit

ContractorWorkScope
Price Gregory[3]Phase I loops (5 mi of 48-inch, 15 mi of 42-inch, 2016-2017) and Phase II (10.3 mi of 42-inch, 2019)
Price Gregory International, LLC[11]PrimeListed 2017 as contractor on the multi-phase Hillabee Expansion of Transco

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Length
Operator
  • Williams (Transco)[7]
  • Transcontinental Gas Pipe Line Company, LLC[7]

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Transco Hillabee Expansion? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. nsenergybusiness.com
  2. worldpipelines.com
  3. pricegregory.com · Price-Gregory-Completed-Pipeline-Project
  4. industrialinfo.com
  5. eia.gov · EIA-NaturalGasPipelineProjects.xlsx
  6. “FERC eLibrary docket CP19-161”. Federal Energy Regulatory Commission. 11 April 2019. Retrieved 3 October 2026.
  7. “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
  8. “FERC eLibrary docket CP15-16”. Federal Energy Regulatory Commission. 18 November 2014. Retrieved 3 October 2026.
  9. “Ongoing Projects: Construction Underway (Pipeline News, August 2019)”. Pipeline News. August 2019. Retrieved 3 October 2026.
  10. “Notice of Commencement of Construction, Hillabee Expansion Project (CP15-16)”. Transcontinental Gas Pipe Line Company, LLC (filed with FERC). 2 September 2016. Retrieved 4 October 2026.
  11. “Ongoing Projects: Construction Underway (Pipeline News, March 2017)”. Pipeline News. March 2017. Retrieved 3 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.