Price Gregory International, LLC
From the ProvenHand pipeline wiki
Price Gregory International, LLC is a pipeline contractor based in Katy, Texas. It is part of Quanta Services, Inc..
| Price Gregory International, LLC | |
|---|---|
| Also called |
|
| General information | |
| Industry | |
| Type | Private[5] |
| Status | Active[6][7] |
| Parent company | Quanta Services, Inc.[7] |
| Predecessors |
|
| Successor |
|
| Headquarters | Katy, Texas, US[6][8][10] |
| Regions | Lower 48, Alaska, Canada[1] |
| Website | www.pricegregory.com[2] |
| PLCA | Member as of 3 October 2026[2] |
| On ProvenHand | |
| Hands listed | 0 |
Price Gregory International, LLC is a pipeline contractor based in Katy, Texas. It is part of Quanta Services, Inc..
This company article is a stub. You can help ProvenHand by expanding it.
Projects
As contractor
| Project | Work | Prime or sub | Scope | Spread | Years | Project built |
|---|---|---|---|---|---|---|
| SEMCO Energy Baraga County 12-inch Pipeline[11] | Prime | 30 miles of 12-inch pipe and station work in Baraga County, Michigan (for Semco Energy) | from 4 May 2026 | 2026 | ||
| Mountain Valley Pipeline[12][13] | Prime | Spread E6: 27 miles of 42-inch, West Virginia | 1 March 2018 – 30 November 2018 | 2024 | ||
| Mountain Valley Pipeline[14] | Prime | Listed through January 2023 as a pipeline construction contractor (with Precision Pipeline and US Trinity Energy Services) | 2024 | |||
| TC Energy Line 8000 Replacement Project[12] | Prime | 6.4 miles of 12-inch, Maryland | 1 April 2019 – 31 August 2019 | 2019–2022 | ||
| Hillabee Expansion phase 2[12] | Prime | Hillabee Phase II Expansion Project: 10.3 miles of 42-inch, Alabama | 13 March 2019 – 31 October 2019 | 2020 | ||
| Keystone XL Pipeline[1][15][16] | Prime | Awarded 155 miles of large-diameter pipe in Keya Paha, Boyd, Holt and Antelope counties NE and Lyman and Tripp counties SD, planned to start summer 2021 | 2020 | |||
| Keystone XL Pipeline[1] | Prime | Two spreads of the Keystone XL Pipeline: about 155 miles in Keya Paha, Boyd, Holt and Antelope counties NE and Lyman and Tripp counties SD; awarded Oct 2020, work expected summer 2021 (near Winner SD) to 2022 (near Norfolk NE) | 2020 | |||
| Transco Hillabee Expansion[17] | Prime | Listed 2017 as contractor on the multi-phase Hillabee Expansion of Transco | 2016–2020 | |||
| Duke Energy Line 451[12] | Prime | Line 451: 20 miles of 20-inch, North Carolina (client Duke Energy) | 31 July 2019 – 31 December 2019 | 2019 | ||
| Duke Energy Line 451[18] | Prime | Awarded by Duke Energy (announced Aug 26, 2019): about 19.28 miles of 20-inch in Lincoln and Catawba counties NC (roundup does not give the line number) | 2019 | |||
| Mountaineer XPress[12][19] | Prime | Spread 5 (20 miles of 36-inch) and Spread 6 (31 miles of 36-inch), West Virginia | 1 February 2018 – 30 November 2018 | 2018–2019 | ||
| Mountaineer XPress Pipeline (TCO Pool)[20] | Pipeline construction (role and spread not stated) | Took part in pipeline construction (per Offshore Technology; spread not stated) | 2019 | |||
| Mountaineer XPress Pipeline (to CGT)[20] | Pipeline construction (role and spread not stated) | Took part in pipeline construction (per Offshore Technology; spread not stated) | 2019 | |||
| Atlantic Sunrise[12] | Compressor station expansion | Station 190 HP expansion (compressor station expansion), Maryland | 1 February 2017 – 31 October 2017 | 2017–2018 | ||
| B-System Project[21][22][23] | Prime | Listed 2018-2019 as contractor: 20.8 miles of 20-inch in Fairfield and Franklin counties, OH | 2018 | |||
| Leach XPress[12] | Prime | Spreads 2A (27.6 miles), 2B (18 miles) and 5 BM-111 (2.5 miles), all 36-inch, Ohio and West Virginia | 1 February 2017 – 30 June 2018 | 2017–2018 | ||
| Leach XPress[12] | Prime | Spread 2A | 2017–2018 | |||
| Leach XPress[12] | Prime | Spread 2B | 2017–2018 | |||
| Rover Pipeline[24] | right-of-way felling contract (per subcontractor entry) | Listed 2017 as the contractor over Pedero's hand felling of 292 miles of 42-inch right-of-way in Ohio and Michigan | 2017–2018 | |||
| Hillabee Expansion phase 1[12][24] | Prime | Hillabee Expansion: 5 miles of 48-inch and 15 miles of 42-inch, Alabama | 1 August 2016 – 30 June 2017 | 2017 | ||
| Sunbury Pipeline Project[12][17] | Prime | 34.4 miles of 20-inch, Pennsylvania | 1 July 2016 – 31 December 2016 | 2016–2017 | ||
| Susquehanna West Project[12][24][25] | Prime | Listed as Triad & Susquehanna West Pipeline Projects (Kinder Morgan): 15 miles of 36-inch, Pennsylvania | 1 February 2017 – 31 October 2017 | 2016–2017 | ||
| Triad Expansion Project[12][19][25] | Prime | Listed as Triad & Susquehanna West Pipeline Projects (Kinder Morgan): 15 miles of 36-inch, Pennsylvania | 1 February 2017 – 31 October 2017 | 2017 | ||
| Cornerstone Pipeline[12] | Prime | Mainline construction for Marathon Petroleum: 42 miles of 16-inch and 0.8 mile of 8-inch (2015-09-15 to 2016-10-31) and 8 miles of 16-inch (2016-09-01 to 2016-12-31) | 15 September 2015 – 31 December 2016 | 2016 | ||
| Keystone Houston Lateral[3][26][27][28][29] | Prime | Houston Lateral Pipeline Project (client TransCanada Pipelines Limited): 48 miles of 36-inch, Texas | until 1 October 2014 | 2016 | ||
| Keystone Houston Lateral[27] | Prime | About 48 miles of 36-inch to connect TransCanada's Gulf Coast Pipeline to Houston-area refineries; limited notice to proceed Oct 2013, completion expected spring 2014 | from 1 October 2013 | 2016 | ||
| REX Zone 3 Capacity Enhancement Project[30] | EPC role not specified (Quanta subsidiary named in the award release) | Under Quanta Services, Inc. | 2016 | |||
| Roadrunner Gas Transmission Pipeline[17] | Prime | Listed 2017 as contractor: 200 miles of 30-inch from Coyanosa, TX toward Mexico | 2016 | |||
| Auburn Line Loop Project[12] | Prime | 9.79 miles of 24-inch, Pennsylvania (client UGI Energy Services) | 1 May 2015 – 31 August 2015 | 2015 | ||
| Line 78 Pipeline Project[12][31][32][33] | Prime | 79 miles of 36-inch, Illinois and Indiana (client Enbridge Energy LP) | 1 March 2015 – 15 September 2015 | 2015 | ||
| Line 78 Pipeline Project[12][31] | Pump station construction | Line 78 - Flanagan general construction: pump station, Illinois (client Enbridge Energy LP) | 1 September 2014 – 31 August 2015 | 2015 | ||
| Line 78 Pipeline Project[31] | Prime | About 79 miles of new 36-inch crude oil mainline from the Flanagan Terminal near Pontiac IL northeast to the Griffith IN terminal; selected Feb 2015, pipeline construction expected March to fall 2015 | 2015 | |||
| Line 78 Pipeline Project[31] | Pump station construction and terminal modifications | Flanagan Terminal pumping station for Line 78 and modifications to the Griffith terminal; construction began late 2014 | from 1 January 2014 | 2015 | ||
| Auburn Line Extension Project[26] | Prime | 27 miles of 24-inch, Pennsylvania (client UGI Energy Services) | until 1 October 2013 | 2014 | ||
| Flanagan South Pipeline[26] | Pump station construction | Humboldt and Pershing pump stations, Kansas and Oklahoma | until 1 November 2014 | 2013–2014 | ||
| Seneca lateral[26] | Prime | REX Seneca Lateral: 17,100 feet of 24-inch, Ohio | until 1 June 2014 | 2013–2014 | ||
| Seneca lateral[26] | Prime | 17,100 ft of 24-inch for Tallgrass - Rockies Express (end date Jun-14 per Price Gregory's list) | until 1 June 2014 | 2013–2014 | ||
| Sierrita Gas Pipeline[26] | Prime | Sierrita Pipeline Project: 60 miles of 36-inch, Texas and Arizona | until 1 December 2014 | 2014 | ||
| Union Dale Lateral[26] | Prime | 6.4 miles of 12-inch, Pennsylvania (client UGI Energy Services) | until 1 October 2014 | 2014 | ||
| Minisink Compressor Project[26] | Compressor station construction | Minisink compressor station for Millennium Pipeline, New York | until 1 June 2013 | 2013 | ||
| Owensboro Replacement Project, Phase II[26] | Prime | 15 miles of 24-inch, Kentucky (client Marathon Petroleum) | until 1 November 2013 | 2013 | ||
| Bison Pipeline[26] | Prime | Bison Pipeline Project Spread 3 (91 miles of 30-inch, Montana and North Dakota) and Spread 4 (118 miles of 30-inch, North Dakota) | until 1 December 2010 | 2010–2011 | ||
| Elm Grove Bienville Pipeline Project[34][35] | Prime | Contractor selected for the Elm Grove Bienville Pipeline (46 miles of 36-inch) | 2009–2010 | |||
| Elm Grove Bienville Pipeline Project[36] | Prime | 36-inch segment of the Haynesville Expansion Project under the Feb 24, 2009 construction contract with Regency Intrastate Gas LLC | 2009–2010 | |||
| Haynesville Expansion Project[26] | Prime | 134 miles of 36-inch and 42-inch, Louisiana | until 1 February 2010 | 2010 | ||
| Haynesville Expansion Project[26] | Prime | 134 miles of 36-inch and 42-inch for Regency Intrastate Gas LP (end date Feb-10 per Price Gregory's list) | until 1 February 2010 | 2010 | ||
| Haynesville Expansion Project[36][37] | Prime | Pipeline Construction Contract of Feb 24, 2009 with Regency Intrastate Gas LLC to build the 36-inch and 42-inch pipeline segments of the Haynesville Expansion Project (unit-priced); contractor named as Price Gregory International, Inc. | 2010 | |||
| Sundance Trail Expansion Project[26] | Prime | Sundance Trail Pipeline: 15.5 miles of 30-inch, Wyoming | until 1 October 2010 | 2010 | ||
| Winnsboro Loop Pipeline Project[35][38] | Prime | Contractor selected for the Winnsboro Loop (75 miles of 42-inch) | 2009–2010 | |||
| Winnsboro Loop Pipeline Project[36] | Prime | 42-inch segment of the Haynesville Expansion Project under the Feb 24, 2009 construction contract with Regency Intrastate Gas LLC | 2009–2010 | |||
| Alaska Nikiski LNG pipeline[39][40] | Prime | Conditional award for Phase One pipeline construction announced by Glenfarne on Jan 22, 2026 after a multi-round bid; subject to a definitive agreement | ||||
| Atlantic Coast Pipeline Project[21][22] | Prime | Listed 2018-2019 as a pipeline construction contractor | ||||
| Aux Sable Pipeline Replacement[26] | Prime | 3.4 miles of 36-inch, Illinois (client Nicor Gas) | until 1 October 2012 | |||
| Avalon Express[26] | Prime | 26.55 miles of 20-inch and 1.72 miles of 8-inch, Texas (client Anadarko Petroleum) | until 1 August 2012 | |||
| Canton Lateral Pipeline[41] | Prime | Energy Transfer Canton Lateral Pipeline: 9.7 miles of 24-inch in Lycoming, Tioga and Bradford counties PA; PGI named as the client of subcontractor Mascaro | ||||
| Exxon-Delaware Connector Pipeline Project[12] | Prime | 65.6 miles of 30-inch, Texas and New Mexico (client Wood Group, LLC) | 1 March 2019 – 31 October 2019 | |||
| Griffith Terminal Expansion Project[12] | Prime | Terminal expansion, Indiana (client Enbridge Energy LP) | 16 October 2015 – 31 March 2016 | |||
| Inertia Gathering Line[26] | Prime | 18.5 miles of 30-inch, Pennsylvania (client Rice Energy) | until 1 November 2014 | |||
| Inertia Gathering Line[42] | Prime | 17.2 miles of 30-inch and 2.1 miles of 16-inch steel with 18-inch HDPE co-located, two HDDs, narrow right-of-way; client Rice Energy | 1 July 2014 – 1 November 2014 | |||
| Jewel Ridge[43] | Prime | 31 miles of 20-inch natural gas pipeline in the mountains of southwest Virginia (client East Tennessee Natural Gas, Duke Energy) | 2 May 2006 – 1 October 2006 | |||
| Keweenaw Connector Pipeline[4][44] | Prime | from 4 May 2026 | ||||
| Keweenaw Connector Pipeline[44] | Prime | 30 miles of 12-inch pipe with station work, Baraga County MI (client Semco Energy); Teamsters listing gives a May 4, 2026 start | from 4 May 2026 | |||
| LN-30 & LN-550 Pipeline Project[26] | Prime | 11,515 feet of 20-inch and 2,787 feet of 16-inch, New York (client Dominion Transmission) | until 1 July 2011 | |||
| LaCrosse Branch Loop 2003[45] | Prime | 43,824 feet of 12-inch loop on the LaCrosse branch line, Olmsted County, MN, with five HDDs (client Northern Natural Gas) | 4 April 2003 – 1 December 2003 | |||
| Line 5B Looping Project[26] | Prime | 20.4 miles of 12-inch, North Carolina (client Piedmont Natural Gas) | until 1 September 2013 | |||
| Loyalsock - Eichenlaub to Miller Pipeline Project[12] | Prime | 20,147 feet of 16-inch and 9,385 feet of 8-inch, Pennsylvania (client Regency Energy Partners) | 16 November 2015 – 15 February 2016 | |||
| Loyalsock Phase 1B North and 1B West[26] | Prime | 5 miles of 16-inch and 2,350 feet of 8-inch, Pennsylvania (client PVR Partners) | until 1 July 2013 | |||
| Loyalsock Phase 1C West[26] | Prime | 29,199 feet of 16-inch and 9,713 feet of 8-inch, Pennsylvania (client PVR Partners) | until 1 July 2014 | |||
| Majorsville to Welling Pipeline Project[26] | Prime | 10 miles of 16-inch and 10 miles of 20-inch, Pennsylvania (client MarkWest) | until 1 January 2013 | |||
| Mariner West Pipeline Project[26] | Prime | 17 miles of 10-inch, Pennsylvania (client MarkWest Energy Partners) | until 1 June 2013 | |||
| Marquette Connector Pipeline Project[12] | Prime | 36 miles of 20-inch, 6.8 miles of 10-inch and 4 stations, Michigan (client SEMCO) | 1 January 2019 – 31 October 2019 | |||
| Maurepas Pipelines Project[25] | Prime | Listed 2016-2017 as contractor: 34.2 miles of 24-inch, 35 miles of 12-inch and 34 miles of 6-inch, St. James and St. Charles parishes, LA | ||||
| P-35 Pipeline Expansion Project[46] | Prime | 5.5 miles of 12-inch pipeline in northern Indiana with four HDDs (client TEPPCO) | 1 August 2004 – 1 October 2004 | |||
| Riverside Energy Center High Pressure Gas Main[47] | Prime | 5.8 miles of 20-inch high-pressure gas pipeline near Beloit, WI, with two HDDs (client Alliant Energy) | 17 March 2003 – 1 May 2003 | |||
| Warrenville Pipeline Project[26] | Prime | 20 miles of 24-inch and 4.18 miles of 16-inch, Pennsylvania (client Anadarko Petroleum) | until 1 December 2012 | |||
| Wyoming Gathering System[26] | Prime | 30 miles of 24-inch, Pennsylvania (client Chief Gathering LLC) | until 1 August 2012 |
Spreads
Spreads this company built as the prime contractor.
| Project | Spread | Dates |
|---|---|---|
| Bison Pipeline | Spread 3[26] | until 1 December 2010 |
| Bison Pipeline | Spread 4[26] | until 1 December 2010 |
| Leach XPress | Spread 2A[12] | 1 February 2017 – 30 November 2017 |
| Leach XPress | Spread 2B[12] | 1 February 2017 – 30 June 2018 |
| Leach XPress | Spread 5 (BM-111)[12] | 1 February 2017 – 31 October 2017 |
| Mountain Valley Pipeline | Spread E6[12] | 1 March 2018 – 30 November 2018 |
| Mountaineer XPress | Spread 5[12] | 1 February 2018 – 30 November 2018 |
| Mountaineer XPress | Spread 6[12] | 4 February 2018 – 30 November 2018 |
References
- “Price Gregory International Selected by TC Energy to Help Construct the Keystone XL Pipeline”. Price Gregory International, Inc. 30 October 2020. Archived from the original on 2 November 2020. Retrieved 6 October 2026.
- “PLCA Member Directory”. Pipe Line Contractors Association. Retrieved 3 October 2026.
- “Keystone Houston Lateral in Baytown, TX – Pedero”. Pedero Pipe Support Systems USA. Archived from the original on 4 March 2017. Retrieved 3 October 2026.
- “Projects”. Right-Of-Way Clearing & Maintenance, Inc. Retrieved 3 October 2026.
- “Quanta Services Form 10-K for 2010”. Quanta Services, Inc. (filed with the SEC). 1 March 2011. Retrieved 6 October 2026.
- “Locations – Price Gregory”. Price Gregory International, LLC. Retrieved 3 October 2026.
- “Exhibit 21.1, Subsidiaries of Quanta Services, Inc. (December 31, 2025)”. Quanta Services, Inc. (filed with the SEC). 19 February 2026. Retrieved 3 October 2026.
- “Price Gregory (Quanta Companies page)”. Quanta Services, Inc. Retrieved 3 October 2026.
- “History – Price Gregory”. Price Gregory International, LLC. Retrieved 3 October 2026.
- “Price Gregory - Quanta Services”. Quanta Services, Inc. Retrieved 6 October 2026.
- “Price Gregory International job notice: Semco Energy, Baraga County, Michigan (dated 2026-04-28)”. Teamsters National Pipeline. 28 April 2026. Retrieved 6 October 2026.
- “Price Gregory Completed Projects - Five Years (2020 list)”. Price Gregory International, LLC. June 2020. Retrieved 3 October 2026.
- “Ongoing Projects: Construction Underway (Pipeline News, July 2019)”. Pipeline News. July 2019. Retrieved 3 October 2026.
- “Pipeline News, Ongoing Projects (January 2023)”. Pipeline & Gas Journal. January 2023. Retrieved 6 October 2026.
- “Keystone XL Adds Contractors for U.S. Spreads”. Pipeline & Gas Journal. 1 December 2020. Retrieved 3 October 2026.
- “Six Contractors Named to Build Keystone XL Pipeline”. Engineering News-Record. 2 November 2020. Retrieved 6 October 2026.
- “Ongoing Projects: Construction Underway (Pipeline News, March 2017)”. Pipeline News. March 2017. Retrieved 3 October 2026.
- “North American Pipeline Project Roundup: October 2019”. Quanta Services (reprinting North American Energy Pipelines). 4 October 2019. Retrieved 6 October 2026.
- “Ongoing Projects: Construction Underway (Pipeline News, February 2018)”. Pipeline News. February 2018. Retrieved 3 October 2026.
- “Mountaineer Xpress Project, West Virginia”. Offshore Technology. 8 March 2019. Retrieved 4 October 2026.
- “Ongoing Projects: Construction Underway (Pipeline News, August 2019)”. Pipeline News. August 2019. Retrieved 3 October 2026.
- “Ongoing Projects: Construction Underway (Pipeline News, March 2019)”. Pipeline News. March 2019. Retrieved 3 October 2026.
- “Supplemental Information Response to Environmental Conditions Including Implementation Plan, B-System Project (CP16-498)”. Columbia Gas Transmission, LLC (filed with FERC). 5 January 2018. Retrieved 4 October 2026.
- “Ongoing Projects: Construction Underway (Pipeline News, May 2017)”. Pipeline News. May 2017. Retrieved 3 October 2026.
- “Ongoing Projects: Construction Underway (Pipeline News, September 2017)”. Pipeline News. September 2017. Retrieved 3 October 2026.
- “Price Gregory Completed Projects - Five Years (2016 list)”. Price Gregory International, LLC. 9 May 2016. Archived from the original on 9 May 2016. Retrieved 3 October 2026.
- “Quanta Services Selected By TransCanada For Houston Lateral Pipeline Project”. Quanta Services, Inc. 30 October 2013. Retrieved 6 October 2026.
- “Quanta Services 8-K Exhibit 99.1, third quarter 2013 results (Houston Lateral award)”. Quanta Services, Inc. (filed with the SEC). 31 October 2013. Retrieved 6 October 2026.
- “Quanta Services selected by TransCanada for Houston lateral pipeline project”. World Pipelines. 30 October 2013. Retrieved 6 October 2026.
- “Quanta Services Selected by Rockies Express Pipeline for the REX Zone Three Capacity Enhancement Project”. Quanta Services, Inc. (press release). 31 August 2015. Retrieved 3 October 2026.
- “Quanta Services Selected by Enbridge for Line 78 Pipeline Project”. Quanta Services, Inc. 2 February 2015. Retrieved 3 October 2026.
- “Quanta Services 8-K Exhibit 99.1, fourth quarter 2014 results (Line 78 award)”. Quanta Services, Inc. (filed with the SEC). 19 February 2015. Retrieved 6 October 2026.
- “Quanta Services to support Line 78 Pipeline Project in US”. NS Energy. 4 February 2015. Retrieved 6 October 2026.
- “Advance Notification of Construction of Facilities (Elm Grove Bienville Pipeline), Regency Intrastate Gas LP (CP09-82)”. Regency Intrastate Gas LP (filed with FERC). 16 March 2009. Retrieved 3 October 2026.
- “Price Gregory completed pipeline projects list (Regency Haynesville Expansion Project, Louisiana, ended Feb-10, 134 miles of 36-inch and 42-inch)”. Price Gregory International. Retrieved 3 October 2026.
- “Regency Energy Partners 8-K (Haynesville joint venture and construction contract)”. Regency Energy Partners LP (filed with the SEC). 18 March 2009. Retrieved 6 October 2026.
- “Pipeline Construction Contract, Regency Intrastate Gas LLC and Price Gregory International, Inc. (Exhibit 10.7)”. Regency Energy Partners LP (filed with the SEC). 18 March 2009. Retrieved 6 October 2026.
- “Advance Notification of Construction of Facilities (second phase, Winnsboro Loop), Regency Intrastate Gas LP (CP09-412)”. Regency Intrastate Gas LP (filed with FERC). 18 May 2009. Retrieved 3 October 2026.
- “Glenfarne Announces Major Phase One Alaska LNG Milestones (press release)”. Alaska LNG / Glenfarne. 22 January 2026. Retrieved 6 October 2026.
- “Glenfarne Progresses from Planning to Building Alaska LNG Pipeline”. Alaska Business Magazine. Retrieved 6 October 2026.
- “PGI-Energy Transfer Canton Lateral Pipeline”. Mascaro Construction Company, LP. Retrieved 6 October 2026.
- “Projects | Price Gregory (2020 capture)”. Price Gregory International, Inc. Archived from the original on 1 October 2020. Retrieved 6 October 2026.
- “Price Gregory : Lower 48 Project Info”. Price Gregory International, LLC. 22 September 2010. Archived from the original on 22 September 2010. Retrieved 3 October 2026.
- “Price Gregory International (job listing: Semco Energy, Baraga County, Michigan)”. Teamsters National Pipeline. Retrieved 6 October 2026.
- “Price Gregory : Lower 48 Project Info”. Price Gregory International, LLC. 22 September 2010. Archived from the original on 22 September 2010. Retrieved 3 October 2026.
- “Price Gregory : Lower 48 Project Info”. Price Gregory International, LLC. 22 September 2010. Archived from the original on 22 September 2010. Retrieved 3 October 2026.
- “Price Gregory : Lower 48 Project Info”. Price Gregory International, LLC. 22 September 2010. Archived from the original on 22 September 2010. Retrieved 3 October 2026.