Winnsboro Loop Pipeline Project
From the ProvenHand pipeline wiki
Winnsboro Loop Pipeline Project is a natural gas pipeline in Louisiana, operated by Regency Intrastate Gas LP. Construction began in 2009 and the line entered service in 2010. It runs 75 miles of 42" pipe.
| Winnsboro Loop Pipeline Project | |
|---|---|
| General information | |
| Status | In service[1] |
| Commodity | Natural gas[2] |
| Operator | |
| Owner and operator | |
| Facility projects | |
| State | Louisiana[2] |
| Counties | Bienville, Caldwell, Franklin, Jackson, Richland[2] |
| Construction started | June 2009[4] |
| In service | January 2010[1] |
| FERC docket | CP09-412[3] |
| Contractors | |
| Technical information | |
| Length | 75 mi[2] |
| Pipe size | 42"[2] |
| Cost | $425 million for the second phase, excluding capitalized labor costs[2] |
| On ProvenHand | |
| Hands listed | 0 |
Winnsboro Loop Pipeline Project is a natural gas pipeline in Louisiana, operated by Regency Intrastate Gas LP. Construction began in 2009 and the line entered service in 2010. It runs 75 miles of 42" pipe.
Contractorsedit
| Contractor | Work | Scope |
|---|---|---|
| Price Gregory International, LLC[2][5] | Prime | Contractor selected for the Winnsboro Loop (75 miles of 42-inch) |
| PBS&J[2] | Environmental permitting consultant (Corps Nationwide Permit 12 application) | Operator's consultant that submitted the Corps Nationwide Permit 12 pre-construction notification for the Winnsboro Loop |
| Price Gregory International, LLC[6] | Prime | 42-inch segment of the Haynesville Expansion Project under the Feb 24, 2009 construction contract with Regency Intrastate Gas LLC |
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Winnsboro Loop Pipeline Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “Regency, GE Energy Financial Services and Alinda announce Haynesville Expansion Project in service (press release, 8-K exhibit 99.1)”. Regency Energy Partners LP (SEC Form 8-K exhibit). 27 January 2010. Retrieved 3 October 2026.
- “Advance Notification of Construction of Facilities (second phase, Winnsboro Loop), Regency Intrastate Gas LP (CP09-412)”. Regency Intrastate Gas LP (filed with FERC). 18 May 2009. Retrieved 3 October 2026.
- “FERC eLibrary docket CP09-412”. Federal Energy Regulatory Commission. 18 May 2009. Retrieved 3 October 2026.
- “Regency Energy Partners announces $47 million expansion in Haynesville Shale (press release, 8-K exhibit 99.1)”. Regency Energy Partners LP (SEC Form 8-K exhibit). 14 September 2009. Retrieved 3 October 2026.
- “Price Gregory completed pipeline projects list (Regency Haynesville Expansion Project, Louisiana, ended Feb-10, 134 miles of 36-inch and 42-inch)”. Price Gregory International. Retrieved 3 October 2026.
- “Regency Energy Partners 8-K (Haynesville joint venture and construction contract)”. Regency Energy Partners LP (filed with the SEC). 18 March 2009. Retrieved 6 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.