Flanagan South Pipeline
From the ProvenHand pipeline wiki
Flanagan South Pipeline is a crude oil pipeline in Illinois, Missouri, Kansas and Oklahoma, operated by Enbridge. Construction began in 2013 and the line entered service in 2014. It runs 593 miles of 36" pipe.[1]
| Flanagan South Pipeline | |
|---|---|
| Also called | Flanagan South, Line 59, FS |
| General information | |
| Status | Approved[4] |
| Commodity | Crude oil |
| Operator | Enbridge |
| States | Illinois, Missouri, Kansas, Oklahoma |
| Construction started | 2013 |
| In service | 2014 |
| Contractors | |
| Technical information | |
| Length | 593 mi |
| Pipe size | 36" |
| On ProvenHand | |
| Hands listed | 0 |
Flanagan South Pipeline is a crude oil pipeline in Illinois, Missouri, Kansas and Oklahoma, operated by Enbridge. Construction began in 2013 and the line entered service in 2014. It runs 593 miles of 36" pipe.[1]
Contractorsedit
| Contractor | Work | Scope | Spread | Years |
|---|---|---|---|---|
| Michels[1] | Spreads 1 and 2 | |||
| U.S. Pipeline[1] | Spreads 3 and 4 (about 300 miles in MO, KS, OK) | |||
| Hoover Construction Company[5][6] | Rock drilling and blasting | Pipeline rock drilling and blasting, Spread 2 (Missouri) | Spread 2 | 1 January 2013 – 1 January 2014 |
| Hoover Construction Company[7] | Rock drilling and blasting | Pipeline rock drilling and blasting, Spread 3 (Missouri and Kansas) | Spread 3 | 1 January 2013 |
| Hoover Construction Company[8][9] | Rock drilling and blasting | Pipeline rock drilling and blasting, Spread 4A (Kansas and Oklahoma) | Spread 4A | 1 January 2013 – 1 January 2014 |
| U.S. Pipeline, Inc.[10][11][12][13] | Prime | Spreads 3 and 4: about 300 miles of 36-inch pipeline in Missouri, Kansas and Oklahoma | 1 January 2013 – 1 January 2014 | |
| Hoover Construction Company[14] | Rock drilling and blasting | Pipeline rock drilling and blasting, Spread 4B (Oklahoma) | Spread 4B | 1 January 2014 |
| Price Gregory International, LLC[15] | Pump station construction | Humboldt and Pershing pump stations, Kansas and Oklahoma | until 1 November 2014 | |
| Michels[16] | Prime | Spread 1: Pontiac, IL to the Illinois/Missouri border (contract awarded June 2013) | Spread 1 | |
| Michels[16] | Prime | Spread 2: Illinois/Missouri border to 1.5 miles south of Mount Leonard, Saline County, MO (contract awarded June 2013) | Spread 2 |
Spreads
| Spread | Prime contractor | Dates |
|---|---|---|
| Spread 1[16][17] | Michels | |
| Spread 2[5][16][17] | Michels | |
| Spread 3[7][11] | U.S. Pipeline, Inc. | from 1 January 2013 |
| Spread 4[11] | U.S. Pipeline, Inc. | from 1 January 2013 |
| Spread 4A[8] | ||
| Spread 4B[14] |
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Flanagan South Pipeline? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- offshore-technology.com
- enbridge.com · FS_EnergyInfrastructureAssets.pdf
- sec.gov · d871102d10k.htm
- “US Pipeline Project Updates, June 18, 2013 (archive 2013-08-30)”. U.S. Pipeline, Inc. 18 June 2013. Archived from the original on 30 August 2013. Retrieved 6 October 2026.
- “2013 Enbridge Flanagan South Drilling and Blasting Spread 2 (Missouri) – Hoover Construction”. Hoover Construction Company. Retrieved 3 October 2026.
- “2014 Enbridge Flanagan South Drilling and Blasting Spread 2 (Missouri) – Hoover Construction”. Hoover Construction Company. Retrieved 3 October 2026.
- “2013 Enbridge Flanagan South Drilling and Blasting Spread 3 (Missouri and Kansas) – Hoover Construction”. Hoover Construction Company. Retrieved 3 October 2026.
- “2013 Enbridge Flanagan South Drilling and Blasting Spread 4A (Kansas and Oklahoma) – Hoover Construction”. Hoover Construction Company. Retrieved 3 October 2026.
- “2014 Enbridge Flanagan South Drilling and Blasting Spread 4A (Kansas and Oklahoma) – Hoover Construction”. Hoover Construction Company. Retrieved 3 October 2026.
- “Recent Projects - U.S. Pipeline (project map)”. U.S. Pipeline, Inc. Retrieved 3 October 2026.
- “Press Releases (archive 2013-08-30)”. U.S. Pipeline, Inc. Archived from the original on 30 August 2013. Retrieved 3 October 2026.
- “U.S. Pipeline news archive, February 2014 (archive 2016-07-30)”. U.S. Pipeline, Inc. Archived from the original on 30 July 2016. Retrieved 3 October 2026.
- “U.S. Pipeline news archive, November 2014 (archive 2016-07-30)”. U.S. Pipeline, Inc. Archived from the original on 30 July 2016. Retrieved 3 October 2026.
- “2014 Enbridge Flanagan South Drilling and Blasting Spread 4B (Oklahoma) – Hoover Construction”. Hoover Construction Company. Retrieved 3 October 2026.
- “Price Gregory Completed Projects - Five Years (2016 list)”. Price Gregory International, LLC. 9 May 2016. Archived from the original on 9 May 2016. Retrieved 3 October 2026.
- “Flanagan South Pipeline project profile”. Offshore Technology. Retrieved 6 October 2026.
- “Brandenburg Drainage, Inc. - Resume (archive 2020-02-22)”. Brandenburg Drainage, Inc. Archived from the original on 27 November 2020. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.