Michels
From the ProvenHand pipeline wiki
Michels is a pipeline contractor based in Brownsville, Wisconsin.
| Michels | |
|---|---|
| General information | |
| Industry | |
| Type | Private[4] |
| Status | Active[5] |
| Predecessors |
|
| Headquarters | Brownsville, Wisconsin[4] |
| Website | www.michels.us[7] |
| PLCA | Not a PLCA member as of 3 October 2026[8] |
| On ProvenHand | |
| Hands listed | 0 |
Michels is a pipeline contractor based in Brownsville, Wisconsin.
This company article is a stub. You can help ProvenHand by expanding it.
Projects
As contractor
| Project | Work | Prime or sub | Scope | Spread | Years | Project built |
|---|---|---|---|---|---|---|
| Port Arthur Pipeline Louisiana Connector[1] | HDD and bore | Under Troy Construction | HDD subcontractor | 2024–2026 | ||
| Kewaskum Compressor Station[9] | Prime | 2024–2025 | ||||
| Weyauwega Compressor Station[9] | Prime | 2025 | ||||
| Wisconsin Reliability Project[2][3][9][10] | Prime | 2024–2025 | ||||
| Albert Lea North E-line Expansion Project[11] | Electrical and instrumentation | Completed electrical work at the Albert Lea compressor station (Nov 10, 2023) | 2023 | |||
| Keystone XL Pipeline[12] | Prime | One of six U.S. union contractors awarded 2021 pipeline construction contracts (announced Oct 2020); project suspended Jan 2021 | 2020 | |||
| Keystone XL Pipeline[13] | Pump station construction | Eight pump stations in Montana, South Dakota, Oklahoma and Texas; started late June 2020, completion planned Q1 2021 | from 1 June 2020 | 2020 | ||
| Keystone XL Pipeline[13] | Pump station construction | Awarded eight pump stations in Montana, South Dakota, Oklahoma and Texas under a TC Energy contract; construction began June 2020, completion planned for Q1 2021 (company release) | from 1 June 2020 | 2020 | ||
| Marquette Branch Line Expansion Project[14] | Prime | 2018–2019 | ||||
| Northern Lights 2019[15] | Prime | Rockford to Buffalo greenfield lateral (about 10.0 miles of 24-inch) | Rockford to Buffalo greenfield lateral | from 14 June 2019 | 2019 | |
| Spire STL Pipeline[16] | Prime | Listed 2018-2019 as the pipeline construction contractor | 2019 | |||
| NEXUS Gas Transmission[17] | subcontractor (work not stated) | Under Fluor | Listed 2017 as a subcontractor to Fluor; work not stated | 2017–2018 | ||
| NEXUS Gas Transmission[16] | Prime | Pipeline construction in Ohio and Michigan (listed 2018-2019) | 2017–2018 | |||
| Rover Pipeline[18] | Prime | Spread 4, Mainlines A and B (101 miles of 42-inch); Burgettstown Lateral (52 miles of 36-inch) (listed 2017) | 2017–2018 | |||
| Lebanon Extension Project[19] | Prime | Listed 2017-2018 as contractor: 2.1 miles of 36-inch in Monroe County, OH | 2017 | |||
| Northern Lights 2017 Expansion[20] | Prime | Listed 2017-2018 as contractor: 5.3 miles of 16-inch (Chisago Interconnect Loop) and 6-inch pipe, Chisago, Le Sueur and Scott counties, MN | 2017 | |||
| Flanagan South Pipeline[21] | Prime | Spread 1: Pontiac, IL to the Illinois/Missouri border (contract awarded June 2013) | Spread 1 | 2013–2014 | ||
| Flanagan South Pipeline[21] | Prime | Spread 2: Illinois/Missouri border to 1.5 miles south of Mount Leonard, Saline County, MO (contract awarded June 2013) | Spread 2 | 2013–2014 | ||
| West Leg 2014 Expansion[22] | Prime | pipeline segments | from 31 March 2014 | 2014 | ||
| Texas East Tran NJ-NY Expansion Project[23] | HDD and bore | Horizontal directional drill work, awarded to its Michels Directional Crossings division (draft Implementation Plan, May 2012) | 2013 | |||
| Tiger Pipeline[24] | Prime | Spreads 3 and 4 (97 miles, from the Bienville Parish compressor station to Franklin Parish, Louisiana) | 2010 | |||
| Rockies Express Pipeline East Project[25] | Prime | Pipeline contractor for 180 miles in eastern Ohio (2009), listed jointly as 'Henkels & McCoy/Michels' on its blasting subcontractor's project list | from 1 January 2009 | 2009 | ||
| Atlantic Coast Pipeline Project[16] | Prime | Listed 2018-2019 as a pipeline construction contractor | ||||
| Dakota Access Pipeline (nd_psc:PU-14-842)[17] | listed contractor (work not stated) | Listed in May 2017 among the Dakota Access contractors (Savage Services Corp., Michels Corp., Precision Pipeline); work not stated | ||||
| Dakota Access Pipeline (nd_psc:PU-14-842)[26] | Prime | North Dakota: Lake Oahe to the state line | ||||
| Savage DAPL Connector Pipeline[27] | listed contractor (work not stated) | Listed 2017 among the project's contractors (Savage Services Corp., Michels Corp., Precision Pipeline); construction then on hold | ||||
| Southern Lights Diluents Pipeline[28] | Prime | Member of the Global Pipeline Partners joint venture (with Welded Construction, Precision Pipeline and U.S. Pipeline) that built 321 miles of 20-inch for Southern Lights in Wisconsin, January 2007 to 2008 | 1 January 2007 – 1 January 2008 |
Spreads
Spreads this company built as the prime contractor.
| Project | Spread | Dates |
|---|---|---|
| Dakota Access Pipeline (nd_psc:PU-14-842) | North Dakota: Lake Oahe to the state line[26] | |
| Flanagan South Pipeline | Spread 1[21][29] | |
| Flanagan South Pipeline | Spread 2[21][29][30] | |
| Northern Lights 2019 | Rockford to Buffalo greenfield lateral[15] | from 14 June 2019 |
| Rover Pipeline | Spread 4[18] | |
| Tiger Pipeline | Spread 3[24][31] | |
| Tiger Pipeline | Spread 4[24][31] | |
| Wisconsin Reliability Project | Segment PL-3[32][33][34] |
Crossings
Crossings this company drilled or bored.
| Project | Feature |
|---|---|
| Texas East Tran NJ-NY Expansion Project | Hudson River[35] |
References
- “Inside Sempra’s 72-mile pipeline with 18 major trenchless crossings”. Underground Infrastructure (written by HDR staff). December 2025. Retrieved 3 October 2026.
- “TC Energy completes Wisconsin Reliability Project”. TC Energy. 3 November 2025. Retrieved 3 October 2026.
- “TC Energy's Wisconsin Reliability Project reaches in-service”. Mott MacDonald. Retrieved 3 October 2026.
- “Michels Corp.: Making History For 50 Years”. Underground Construction. June 2009. Retrieved 6 October 2026.
- “Michels Family of Companies media kit (June 2024)”. Michels Corporation. 20 June 2024. Retrieved 6 October 2026.
- “About Us (Michels Pipeline, Inc.): company history”. Michels Corporation. Retrieved 3 October 2026.
- “Challenges Of Overlapping Construction On 3 Major Pipeline Projects”. Underground Construction. May 2010. Retrieved 6 October 2026.
- “PLCA Member Directory”. Pipe Line Contractors Association. Retrieved 3 October 2026.
- “Top Projects of 2025: Wisconsin Reliability Project”. The Daily Reporter. 8 May 2026. Retrieved 3 October 2026.
- “TC Energy Puts $700 Million Wisconsin Pipeline Project in Service”. Pipeline & Gas Journal. 4 November 2025. Retrieved 3 October 2026.
- “Weekly Environmental Inspector Report No. 25 (November 6 to November 12, 2023), Albert Lea North E-line Expansion Project (CP22-489)”. Northern Natural Gas Company (filed with FERC). 16 November 2023. Retrieved 3 October 2026.
- “TC Energy Awards More Than $1.6 billion in American Contracts to Build Keystone XL”. TC Energy Corporation. 28 October 2020. Retrieved 3 October 2026.
- “Michels selected to build facilities on Keystone XL”. Michels Corporation. 3 September 2020. Retrieved 3 October 2026.
- “Weekly report No. 1, Marquette Branch Line Expansion Project (CP18-81)”. Northern Natural Gas Company (filed with FERC). 29 May 2018. Retrieved 4 October 2026.
- “Northern Lights 2019 and Rochester Expansion Projects (CP18-534) Biweekly Status Report No. 8, June 17-30, 2019”. Northern Natural Gas Company (filed with FERC). 9 July 2019. Retrieved 4 October 2026.
- “Ongoing Projects: Construction Underway (Pipeline News, August 2019)”. Pipeline News. August 2019. Retrieved 3 October 2026.
- “Ongoing Projects: Construction Underway (Pipeline News, May 2017)”. Pipeline News. May 2017. Retrieved 3 October 2026.
- “Ongoing Projects: Construction Underway (Pipeline News, October 2018)”. Pipeline News. October 2018. Retrieved 3 October 2026.
- “Ongoing Projects: Construction Underway (Pipeline News, February 2018)”. Pipeline News. February 2018. Retrieved 3 October 2026.
- “Ongoing Projects: Construction Underway (Pipeline News, July 2018)”. Pipeline News. July 2018. Retrieved 3 October 2026.
- “Flanagan South Pipeline project profile”. Offshore Technology. Retrieved 6 October 2026.
- “Biweekly Status Report No. 2, West Leg 2014 Expansion Project (CP13-528)”. Northern Natural Gas Company (filed with FERC). 9 April 2014. Retrieved 4 October 2026.
- “Draft Implementation Plan, New Jersey-New York Expansion Project (CP11-56)”. Texas Eastern Transmission, LP and Algonquin Gas Transmission, LLC (filed with FERC). 18 May 2012. Retrieved 4 October 2026.
- “ETC Tiger Pipeline Project (project page)”. Offshore Technology (offshore-technology.com). 24 June 2010. Retrieved 4 October 2026.
- “Projects (company resume): Pipeline Drilling & Blasting”. Gregory General Contracting, Inc. Retrieved 4 October 2026.
- “Dakota Access Pipeline Project progress report, month ending June 2016, PU-14-842”. Dakota Access, LLC (filed with the North Dakota Public Service Commission). 13 July 2016. Retrieved 3 October 2026.
- “Ongoing Projects: Construction Underway (Pipeline News, March 2017)”. Pipeline News. March 2017. Retrieved 3 October 2026.
- “Global Pipeline Partners Complete Two Wisconsin Pipelines”. Underground Construction. November 2008. Retrieved 6 October 2026.
- “Brandenburg Drainage, Inc. - Resume (archive 2020-02-22)”. Brandenburg Drainage, Inc. Archived from the original on 27 November 2020. Retrieved 3 October 2026.
- “2013 Enbridge Flanagan South Drilling and Blasting Spread 2 (Missouri) – Hoover Construction”. Hoover Construction Company. Retrieved 3 October 2026.
- “Weekly Construction Status Report No. 1 (April 7-14, 2010), ETC Tiger Pipeline Project (CP09-460)”. ETC Tiger Pipeline, LLC (filed with FERC). 16 April 2010. Retrieved 4 October 2026.
- “Abbreviated Application for a Certificate and Abandonment Authority, Wisconsin Reliability Project (CP23-15)”. ANR Pipeline Company (filed with FERC). 14 November 2022. Retrieved 3 October 2026.
- “Environmental Compliance Monitoring Report, May 11-17, 2025, Wisconsin Reliability Project (CP23-15)”. FERC (third-party compliance monitor report). 29 May 2025. Retrieved 3 October 2026.
- “Environmental Compliance Monitoring Report, Oct 27-Nov 1, 2025, Wisconsin Reliability Project (CP23-15)”. FERC (third-party compliance monitor report). 4 November 2025. Retrieved 3 October 2026.
- “New York & New Jersey Pipeline Expansion Project (project page)”. Jay Cashman, Inc. Retrieved 4 October 2026.