Tiger Pipeline is a natural gas pipeline in Texas and Louisiana. It was built and entered service in 2010. It runs 175 miles of 42" pipe.[1]

Tiger Pipeline
Also calledETC Tiger Pipeline[3], Tiger
General information
Project typeNew build[2]
StatusIn service[2]
CommodityNatural gas[2]
OperatorEnergy Transfer Partners[3] or ETC Tiger Pipeline, LLC[3][sources disagree]
Owner and operator
StatesTexas, Louisiana[2][3]
Announced27 January 2009[4]
Approved7 April 2010[3][5]
Construction started2010
In serviceDecember 2010[2]
FERC docketCP09-460[3]
FERC pre-filing docketPF09-9[3]
Contractors
Technical information
Length175 mi[2][3]
Pipe size42"[2]
Capacity2000 MMcf/d (FERC project list)[2][3]
Horsepower added119,680 hp[5]
Cost$1200 million (EIA estimate; no dollar year given)[2] or $1,195,590,343 estimated cost (certificate order)[5][sources disagree]
On ProvenHand
Hands listed0

Tiger Pipeline is a natural gas pipeline in Texas and Louisiana. It was built and entered service in 2010. It runs 175 miles of 42" pipe.[1]

Contractorsedit

ContractorWorkPrime or subScope
Henkels & McCoy[1]78 miles of mainline
Michels Corporation[1]97 miles of mainline
Pedero Pipe Support Systems USA[6]Pipeline foam (trench breakers and pillows)Under Henkels & McCoy, Inc.Breakers, listed as Tiger Pipeline in Louisiana
Michels Pipeline, Inc.[7]Pipeline construction (role not stated)Listed on the firm's 2014 pipeline page (as Michels Pipeline Construction) among five of the largest pipeline projects it had recently worked on; role and years not stated
Henkels & McCoy, Inc.[1]PrimeSpreads 1 and 2 (78 miles; the first section ends at the compressor station in Bienville Parish, Louisiana)
Michels[1]PrimeSpreads 3 and 4 (97 miles, from the Bienville Parish compressor station to Franklin Parish, Louisiana)
Henkels & McCoy, Inc.[8]PrimeNamed as the contractor on the Tiger Pipeline in Louisiana (Energy Transfer) by its pipe-support supplier's project page (foam breakers)

NDT

FirmHired byScope
AUT Specialists LLC[1]Henkels & McCoy, Inc.Awarded the non-destructive examination contract by Henkels & McCoy in June 2010 (listed on the page as sub-contractor)

Spreads

SpreadPrime contractor
Spread 1[1][9]Henkels & McCoy, Inc.
Spread 2[1][9]Henkels & McCoy, Inc.
Spread 3[1][9]Michels
Spread 4[1][9]Michels

Crossings

FeatureMethod
Bee Bayou[1]HDD

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Cost
  • $1200 million (EIA estimate; no dollar year given)[2]
  • $1,195,590,343 estimated cost (certificate order)[5]
Operator
  • Energy Transfer Partners[3]
  • ETC Tiger Pipeline, LLC[3]

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Tiger Pipeline? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “ETC Tiger Pipeline Project (project page)”. Offshore Technology (offshore-technology.com). 24 June 2010. Retrieved 4 October 2026.
  2. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  3. “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
  4. “Energy Transfer Partners Announces Plans to Construct Haynesville Pipeline (Form 8-K, Exhibit 99.1)”. Energy Transfer Partners, L.P. (SEC filing). 27 January 2009. Retrieved 4 October 2026.
  5. “Order Issuing Certificates, ETC Tiger Pipeline, LLC, Tiger Pipeline (CP09-460)”. FERC (order). 7 April 2010. Retrieved 4 October 2026.
  6. “Tiger Pipeline in Louisiana – Pedero”. Pedero Pipe Support Systems USA. Archived from the original on 4 March 2017. Retrieved 3 October 2026.
  7. “Pipeline: Mainline (Michels Pipeline Construction)”. Michels Corporation. Archived from the original on 12 August 2014. Retrieved 3 October 2026.
  8. “Pedero project page: Tiger Pipeline in Louisiana (operator Energy Transfer, contractor Henkels)”. Pedero Pipe Support Systems USA. Archived from the original on 4 March 2017. Retrieved 6 October 2026.
  9. “Weekly Construction Status Report No. 1 (April 7-14, 2010), ETC Tiger Pipeline Project (CP09-460)”. ETC Tiger Pipeline, LLC (filed with FERC). 16 April 2010. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.