Henkels & McCoy, Inc.
From the ProvenHand pipeline wiki
Henkels & McCoy, Inc. is a pipeline contractor based in Blue Bell, Pennsylvania. It is part of MasTec, Inc..
| Henkels & McCoy, Inc. | |
|---|---|
| Also called |
|
| General information | |
| Industry | |
| Type | Private[5] |
| Status | Active[5][6] |
| Parent company | MasTec, Inc.[7] |
| Successor |
|
| Headquarters | Blue Bell, Pennsylvania, US[6][10] |
| Regions | AL, IL, IN, NJ, PA, TN, VA[10] |
| Website | www.henkels.com[2] |
| PLCA | Member as of 3 October 2026[2] |
| On ProvenHand | |
| Hands listed | 0 |
Henkels & McCoy, Inc. is a pipeline contractor based in Blue Bell, Pennsylvania. It is part of MasTec, Inc..
This company article is a stub. You can help ProvenHand by expanding it.
Projects
As contractor
| Project | Work | Scope | Spread | Years | Project built |
|---|---|---|---|---|---|
| Atlantic Bridge Project[11] | Prime | Listed 2017-2018 as contractor: take-up, relay and new lays of 12- to 42-inch pipeline and compressor station work | 2017–2021 | ||
| Mountaineer XPress[12] | Prime | Listed 2018 as a pipeline construction contractor | 2018–2019 | ||
| Mountaineer XPress Pipeline (TCO Pool)[13] | Pipeline construction (role and spread not stated) | Took part in pipeline construction and was contracted to build warehouses in Jackson and Cabell counties (per Offshore Technology) | 2019 | ||
| Mountaineer XPress Pipeline (to CGT)[13] | Pipeline construction (role and spread not stated) | Took part in pipeline construction and was contracted to build warehouses in Jackson and Cabell counties (per Offshore Technology) | 2019 | ||
| Connecticut Expansion Project[14] | Prime | Listed 2017 as contractor: looping of 24-inch and 36-inch pipeline in New York, Massachusetts and Connecticut | 2017 | ||
| Connecticut Expansion Project[15] | Prime | Awarded by Kinder Morgan/Tennessee Gas Pipeline: about 1.3 miles of 36-inch in Albany County, NY, 3.8 miles of 36-inch in Berkshire County, MA and 8.3 miles of 24-inch in Hartford County, CT; HQ Windsor Locks, CT; approximate start March 15, 2017 | from 1 March 2017 | 2017 | |
| Connecticut Expansion Project[4] | Prime | Listed September 2017 as contractor on the Connecticut Expansion: fabrication and installation of 13.4 miles of 24- and 36-inch pipeline looping in Albany County, NY, Berkshire and Hampden counties, MA and Hartford County, CT | 2017 | ||
| The Orion Project.[14] | Prime | Listed 2017 as contractor: about 13 miles of pipeline looping in Pike and Wayne counties, PA | 2017 | ||
| The Orion Project.[16] | Prime | Named in Tennessee's weekly FERC status report as its contractor on the Orion loops: final tie-ins on Loops 322 and 323, the new launcher and receiver, crossover and connection facilities, and right-of-way cleanup (Nov-Dec 2017) | 2017 | ||
| Transco Dalton Expansion[14] | Prime | Listed 2016-2017 with U.S. Pipeline as contractor on the Dalton Expansion | 2017 | ||
| Transco Dalton Expansion[17] | Prime | Installation of 20-inch and 16-inch pipeline, 56 miles, in Bartow, Murray, Gordon and Whitfield counties, GA, for Williams Transco (listed November 2016; start 2016); the record's North Spread is the 20-inch Dalton Lateral and 16-inch AGL Spur | North Spread | from 1 January 2016 | 2017 |
| Transco Dalton Expansion[18] | Prime | Dalton Expansion (about 106 miles of 30-, 24-, 20- and 16-inch for Williams Transco) let in two spreads to U.S. Pipeline and Henkels & McCoy, beginning September 2016 (union report); the November 2016 report expected a start by November 1, 2016 | 2017 | ||
| Texas East Tran NJ-NY Expansion Project[19] | Prime | Spread 2: Bayonne and Jersey City, NJ and Manhattan, NY pipeline segments and ancillary aboveground facilities (draft Implementation Plan, May 2012) | Spread 2 | 2013 | |
| Tiger Pipeline[20] | Prime | Spreads 1 and 2 (78 miles; the first section ends at the compressor station in Bienville Parish, Louisiana) | 2010 | ||
| Tiger Pipeline[21] | Prime | Named as the contractor on the Tiger Pipeline in Louisiana (Energy Transfer) by its pipe-support supplier's project page (foam breakers) | 2010 | ||
| Transcontinental Gas Pipe Line Delta Lateral Project[22] | Prime | Named as the contractor in Transco's bi-weekly construction status report for March 31 to April 16, 2010 (3.42-mile, 16-inch Delta Lateral; Station 195 yard) | 2010 | ||
| Rockies Express Pipeline East Project[23] | Prime | Pipeline contractor for 180 miles in eastern Ohio (2009), listed jointly as 'Henkels & McCoy/Michels' on its blasting subcontractor's project list | from 1 January 2009 | 2009 | |
| Cameron Interstate Pipeline[24][25] | Prime | general contractor for the 36.5-mile, 42-inch Cameron Interstate Pipeline | Mainline | 2007–2008 | |
| MinnCan Pipeline[3] | Prime | Built the 150-mile 24-inch pipeline from near the Canadian border to the Koch refinery area at Minneapolis-St. Paul, with over 20 directional drills (firm's figures) | until 1 January 2008 | 2007 | |
| MinnCan Pipeline[26] | Prime | Credited by its drain-tile subcontractor as the contractor (as 'Henkels and McCoy Pipeline') on a Koch Pipeline project at Minneapolis, MN worked September 2007 to May 2008 | 2007 | ||
| Constitution Pipeline CP13-499[27] | Prime | Union job notifications of November 2015: three spreads, 77.11 miles of 30-inch pipe in New York; start date not known at the time (the project was not built) | |||
| Dubuque Pipeline Replacement[4] | Prime | Listed 2017 as contractor: 8 miles of 30-inch, with abandonment and station interconnections, Kane County, IL |
Spreads
Spreads this company built as the prime contractor.
| Project | Spread | Dates |
|---|---|---|
| Cameron Interstate Pipeline | Mainline[24] | from 30 November 2007 |
| Texas East Tran NJ-NY Expansion Project | Spread 2[19] | |
| Tiger Pipeline | Spread 1[20][28] | |
| Tiger Pipeline | Spread 2[20][28] | |
| Transco Dalton Expansion | North Spread[17][29] | from 1 January 2016 |
References
- “Henkels & McCoy home page (H&M)”. Henkels & McCoy, Inc. Retrieved 6 October 2026.
- “PLCA Member Directory”. Pipe Line Contractors Association. Retrieved 3 October 2026.
- “Recent Projects (Pipeline and Natural Gas)”. Henkels & McCoy, Inc. Archived from the original on 23 January 2012. Retrieved 3 October 2026.
- “Ongoing Projects: Construction Underway (Pipeline News, September 2017)”. Pipeline News. September 2017. Retrieved 3 October 2026.
- “About Us (a subsidiary of MasTec, Inc.)”. Henkels & McCoy, Inc. Retrieved 6 October 2026.
- “Projects page (headquarters in Blue Bell, PA)”. Henkels & McCoy, Inc. Retrieved 3 October 2026.
- “Exhibit 21.1, Subsidiaries of MasTec, Inc. (December 31, 2025)”. MasTec, Inc. (filed with the SEC). 26 February 2026. Retrieved 3 October 2026.
- “Archived News (2015-2017 releases, incl. Henkels & McCoy Group, Inc. established as parent holding company, May 17, 2016)”. Henkels & McCoy, Inc. Archived from the original on 23 September 2017. Retrieved 6 October 2026.
- “News (H&M Groups site, 2016): formation of Henkels & McCoy Group, Inc. as parent holding company; headquarters 985 Jolly Road, Blue Bell, PA”. Henkels & McCoy Group, Inc. / H&M Shared Services, Inc. 2016. Archived from the original on 23 June 2016. Retrieved 6 October 2026.
- “Locations (headquarters and offices)”. Henkels & McCoy, Inc. Retrieved 6 October 2026.
- “Ongoing Projects: Construction Underway (Pipeline News, October 2018)”. Pipeline News. October 2018. Retrieved 3 October 2026.
- “Ongoing Projects: Construction Underway (Pipeline News, February 2018)”. Pipeline News. February 2018. Retrieved 3 October 2026.
- “Mountaineer Xpress Project, West Virginia”. Offshore Technology. 8 March 2019. Retrieved 4 October 2026.
- “Ongoing Projects: Construction Underway (Pipeline News, May 2017)”. Pipeline News. May 2017. Retrieved 3 October 2026.
- “Pipeline Project Roundup, April 2017”. North American Oil & Gas Pipelines. April 2017. Archived from the original on 9 August 2017. Retrieved 6 October 2026.
- “Weekly status report, Nov 27 to Dec 3, 2017, Orion Project (CP16-4)”. Tennessee Gas Pipeline Company, L.L.C. (filed with FERC). 6 December 2017. Retrieved 6 October 2026.
- “Ongoing Projects: The Americas (Pipeline News, April 2017)”. Pipeline News / Pipeline & Gas Journal. April 2017. Retrieved 6 October 2026.
- “Blue Light Reports, September/October 2016 (Dalton Expansion let in two spreads)”. Pipeliners Local Union 798. September 2016. Retrieved 6 October 2026.
- “Draft Implementation Plan, New Jersey-New York Expansion Project (CP11-56)”. Texas Eastern Transmission, LP and Algonquin Gas Transmission, LLC (filed with FERC). 18 May 2012. Retrieved 4 October 2026.
- “ETC Tiger Pipeline Project (project page)”. Offshore Technology (offshore-technology.com). 24 June 2010. Retrieved 4 October 2026.
- “Pedero project page: Tiger Pipeline in Louisiana (operator Energy Transfer, contractor Henkels)”. Pedero Pipe Support Systems USA. Archived from the original on 4 March 2017. Retrieved 6 October 2026.
- “Bi-weekly Construction Status Report, March 31 to April 16, 2010, Delta Lateral Project (CP09-237)”. Transcontinental Gas Pipe Line Company, LLC (filed with FERC). 20 April 2010. Retrieved 4 October 2026.
- “Projects (company resume): Pipeline Drilling & Blasting”. Gregory General Contracting, Inc. Retrieved 4 October 2026.
- “Construction Progress Report No. 3 (Dec 16-31, 2007), Cameron Interstate Pipeline (CP05-119)”. Cameron Interstate Pipeline, LLC (filed with FERC). 9 January 2008. Retrieved 3 October 2026.
- “Record 42-Inch Bore Helps Connect LNG Terminal, Pipelines”. Underground Construction magazine. April 2009. Retrieved 3 October 2026.
- “Brandenburg Drainage project resume (Koch Pipeline project, Minneapolis MN, contracted by Henkels and McCoy Pipeline)”. Brandenburg Drainage, Inc. Archived from the original on 27 November 2020. Retrieved 6 October 2026.
- “Blue Light Reports, November/December 2015 (job reports naming Charps Welding)”. Pipeliners Local Union 798. November 2015. Retrieved 6 October 2026.
- “Weekly Construction Status Report No. 1 (April 7-14, 2010), ETC Tiger Pipeline Project (CP09-460)”. ETC Tiger Pipeline, LLC (filed with FERC). 16 April 2010. Retrieved 4 October 2026.
- “Construction status report for the period ending November 5, 2016, Dalton Expansion Project (CP15-117)”. Transcontinental Gas Pipe Line Company, LLC (filed with FERC). 9 November 2016. Retrieved 4 October 2026.