Rockies Express Pipeline East Project

From the ProvenHand pipeline wiki

Rockies Express Pipeline East Project is a pipeline project in Illinois, Indiana, Missouri and Ohio, operated by Rockies Express Pipeline LLC/East. It entered service in 2009. It runs 638 miles.

Rockies Express Pipeline East Project
General information
KindPipeline project[1]
StatusIn service[2]
OperatorRockies Express Pipeline LLC/East[3]
Owner and operator
Facility projects
StatesIllinois, Indiana, Missouri, Ohio[3]
Approved30 May 2008[3]
In service12 November 2009[2]
FERC docketCP07-208[3]
FERC pre-filing docketPF06-30[1]
Contractors
Technical information
Length638 mi[3]
Capacity1800 MMcf/d (FERC project list)[3]
On ProvenHand
Hands listed0

Rockies Express Pipeline East Project is a pipeline project in Illinois, Indiana, Missouri and Ohio, operated by Rockies Express Pipeline LLC/East. It entered service in 2009. It runs 638 miles.

Contractorsedit

ContractorWorkScopeSpreadYears
R-Value Foam Insulation LLC[6]Scope not itemized (foam padding and restoration firm)REX East project, 2007 and 2008: 144 miles of 42-inch pipe through Pike County, Missouri, and Illinois1 January 2007 – 1 January 2008
Hoover Construction Company[7]Rock drilling and blastingPipeline rock drilling and blasting, Spread 1 (Missouri and Illinois)Spread 11 January 2008
Hoover Construction Company[8]Rock drilling and blastingPipeline rock drilling and blasting, Spread 2 (Missouri and Illinois)Spread 21 January 2008
Henkels & McCoy, Inc.[9]PrimePipeline contractor for 180 miles in eastern Ohio (2009), listed jointly as 'Henkels & McCoy/Michels' on its blasting subcontractor's project listfrom 1 January 2009
Michels[9]PrimePipeline contractor for 180 miles in eastern Ohio (2009), listed jointly as 'Henkels & McCoy/Michels' on its blasting subcontractor's project listfrom 1 January 2009
Gregory General Contracting, Inc.[9]pipeline drilling and blastingRockies Express, 180 miles in eastern Ohio, 2009, working for Henkels & McCoy/Michelsfrom 1 January 2009
Michels Pipeline Construction, Inc.[10]PrimeSpread H: 52 miles of 42-inch near Circleville, OH (warehouse at Circleville; 828 people at peak)Spread H4 May 2009 – 24 November 2009
Brandenburg Drainage, Inc.[11]Drain tile installation and repairREX East spreads B, C, E, F, F2 and G (Illinois, Indiana, Ohio), through H.C. Price and Sheehan Pipeline: 590,409 feet of tile across the ditch, 992,604 feet parallel to the pipeline, 127,849 feet of temporary tile repairs1 August 2009 – 1 June 2010
Associated Pipe Line Contractors, Inc.[12]PrimeSpread D: 67.8 miles of pipeline in IndianaSpread D
HC Price Construction[12]PrimeSpread C: 46.7-mile section through Douglas and Edgar Counties, Illinois, toward the Indiana lineSpread C
Mundell & Associates[13]environmental consulting (FERC-required SPCC plan for the Hoosier Hills Wellhead Protection Area crossing)SPCC plan for construction across the Hoosier Hills Wellhead Protection Area, Franklin County, Indiana

Inspection

FirmScopeYears
Mundell & Associates[13]Environmental oversight of construction within the Hoosier Hills Wellhead Protection Area (about three months, completed June 2009)until 1 June 2009

Spreads

SpreadPrime contractorDates
Spread 1[7]
Spread 2[8]
Spread A-2[14]
Spread B[15]
Spread C[12][16]HC Price Construction
Spread D[12][17]Associated Pipe Line Contractors, Inc.
Spread E[18]
Spread F[19]
Spread G[20]
Spread H[10][21]Michels Pipeline Construction, Inc.4 May 2009 – 24 November 2009
Spread K[22]

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Rockies Express Pipeline East Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC eLibrary docket CP07-208”. Federal Energy Regulatory Commission. 17 April 2007. Retrieved 3 October 2026.
  2. “Kinder Morgan Energy Partners fourth-quarter 2009 earnings release (Form 8-K exhibit 99.1)”. Kinder Morgan Energy Partners, L.P. (SEC filing). 20 January 2010. Retrieved 4 October 2026.
  3. “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
  4. “Rockies Express Pipeline LLC, Commencement of Service MP 0.0 to MP 444.0 (CP07-208)”. Rockies Express Pipeline LLC (FERC eLibrary). 2 July 2009. Retrieved 4 October 2026.
  5. “Rockies Express Pipeline LLC filing: service request for mileposts 444.0 to 639.1, REX-East (CP07-208)”. Rockies Express Pipeline LLC (FERC eLibrary). 5 November 2009. Retrieved 4 October 2026.
  6. “PROJECTS - R-Value Foam”. R-Value Foam Insulation LLC. Retrieved 3 October 2026.
  7. “2008 Rockies Express Pipeline Spread 1 (Missouri and Illinois) – Hoover Construction”. Hoover Construction Company. Retrieved 3 October 2026.
  8. “2008 Rockies Express Pipeline Spread 2 (Missouri and Illinois) – Hoover Construction”. Hoover Construction Company. Retrieved 3 October 2026.
  9. “Projects (company resume): Pipeline Drilling & Blasting”. Gregory General Contracting, Inc. Retrieved 4 October 2026.
  10. “Challenges Of Overlapping Construction On 3 Major Pipeline Projects”. Underground Construction. May 2010. Retrieved 6 October 2026.
  11. “Brandenburg Drainage, Inc. - Resume (archive 2020-02-22)”. Brandenburg Drainage, Inc. Archived from the original on 27 November 2020. Retrieved 3 October 2026.
  12. “Rockies Express Pipeline - New Natural Gas Pipeline, USA”. Offshore Technology. 23 December 2008. Retrieved 4 October 2026.
  13. “Pipeline - Rockies Express East (case history)”. Mundell & Associates. 2 September 2010. Retrieved 4 October 2026.
  14. “Letter order, Authorization to Start Construction of Spread A-2, REX-East (CP07-208)”. Federal Energy Regulatory Commission, Office of Energy Projects. 18 July 2008. Retrieved 4 October 2026.
  15. “Letter order, Authorization to Start Construction of Spread B, REX-East (CP07-208)”. Federal Energy Regulatory Commission, Office of Energy Projects. 9 July 2008. Retrieved 4 October 2026.
  16. “Letter order, Authorization to Start Construction of Spread C, REX-East (CP07-208)”. Federal Energy Regulatory Commission, Office of Energy Projects. 14 July 2008. Retrieved 4 October 2026.
  17. “Letter order, Authorization to Start Construction of Spread D, REX-East (CP07-208)”. Federal Energy Regulatory Commission, Office of Energy Projects. 1 August 2008. Retrieved 4 October 2026.
  18. “Letter order, Authorization to Start Construction of Spread E, REX-East (CP07-208)”. Federal Energy Regulatory Commission, Office of Energy Projects. 11 September 2008. Retrieved 4 October 2026.
  19. “Letter order, Authorization to Start Construction of Spread F (Milepost 404.7 to 432.9), REX-East (CP07-208)”. Federal Energy Regulatory Commission, Office of Energy Projects. 14 October 2008. Retrieved 4 October 2026.
  20. “Letter order approving start of construction of Spread G between MP 444.0 and 467.2, REX-East (CP07-208), eLibrary record”. Federal Energy Regulatory Commission. 5 May 2009. Retrieved 4 October 2026.
  21. “Letter order approving start of construction of Spread H, REX-East (CP07-208), eLibrary record”. Federal Energy Regulatory Commission. 6 February 2009. Retrieved 4 October 2026.
  22. “Letter order, Authorization to Start Construction of Spread K, REX-East (CP07-208)”. Federal Energy Regulatory Commission, Office of Energy Projects. 19 March 2009. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.