KM REX-East Leg 2
From the ProvenHand pipeline wiki
KM REX-East Leg 2 is a natural gas pipeline in Ohio, operated by Rockies Express Pipeline LLC. It entered service in 2009. It runs 195.1 miles of 42" pipe.
| KM REX-East Leg 2 | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | New build[1] |
| Status | In service[1] |
| Commodity | Natural gas[1] |
| Operator |
|
| Part of | Rockies Express Pipeline East Project[2] |
| State | Ohio[1] |
| Approved | 30 May 2008[3] |
| In service | 12 November 2009[1] |
| FERC docket | CP07-208[1] |
| FERC pre-filing docket | PF06-30[1] |
| Technical information | |
| Length | 195.1 mi[1] |
| Pipe size | 42"[1] |
| Capacity | 1800 MMcf/d additional capacity (EIA)[1] |
| Cost | $1162 million (EIA estimate; no dollar year given)[1] |
| On ProvenHand | |
| Hands listed | 0 |
KM REX-East Leg 2 is a natural gas pipeline in Ohio, operated by Rockies Express Pipeline LLC. It entered service in 2009. It runs 195.1 miles of 42" pipe.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on KM REX-East Leg 2? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “Rockies Express Pipeline LLC filing: service request for mileposts 444.0 to 639.1, REX-East (CP07-208)”. Rockies Express Pipeline LLC (FERC eLibrary). 5 November 2009. Retrieved 4 October 2026.
- “Order issuing certificate(s), docket CP07-208: Order issuing certificate re Rockies Express Pipeline, LLC under CP07-208.”. Federal Energy Regulatory Commission. 30 May 2008. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.