Rockies Express Pipeline LLC
From the ProvenHand pipeline wiki
Rockies Express Pipeline LLC is a pipeline owner-operator based in Lakewood, Colorado.
| Rockies Express Pipeline LLC | |
|---|---|
| Legal name | ROCKIES EXPRESS PIPELINE LLC[1] |
| Formerly |
|
| General information | |
| Industry | |
| Headquarters | Lakewood, Colorado[1] |
| PHMSA operator ID | 32163[4] |
| Earlier PHMSA operator ID | 32163[1] |
| On ProvenHand | |
| Hands listed | 0 |
Rockies Express Pipeline LLC is a pipeline owner-operator based in Lakewood, Colorado.
This company article is a stub. You can help ProvenHand by expanding it.
Names
| Name | Kind | Years |
|---|---|---|
| Rockies Express Pipeline LLC (km)[1] | Former name | 1 January 2007 – 1 January 2011 |
Pipeline systems and facilities
1 system and facility this company owned or operated, current ones first.
| System or facility | Kind | State | Role |
|---|---|---|---|
| Rockies Express Pipeline[1] | Pipeline system | CO, IL, IN, KS, MO, NE, OH, WY | Operator |
Projects
As owner or operator
| Project | Role | Status | Project built |
|---|---|---|---|
| Hereford Ranch Compressor Station (Trailblazer Conversion Project)[5] | Owner and operator | In service | 2024 |
| Logan Compressor and Regulating Station (Trailblazer Conversion Project)[5] | Owner and operator | In service | 2024 |
| Redtail Compressor Station (Trailblazer Conversion Project)[5] | Owner and operator | In service | 2024 |
| Trailblazer Conversion Project[2] | Owner and operator | In service | 2024 |
| Cheyenne Hub Enhancement Project[3] | Operator | In service | 2020 |
| Cheyenne Hub Enhancement Project[6] | Owner and operator | In service | 2020 |
| REX Zone 3 Capacity Enhancement Project[2] | Owner and operator | In service | 2016 |
| Zone 3 East-to-West Project[2] | Owner and operator | In service | 2015 |
| Seneca lateral[3] | Operator | In service | 2013–2014 |
| REX Meeker to Cheyenne Expansion Compressor[2] (as Rockies Express Pipeline LLC (km)) | Owner and operator | In service | 2010 |
| KM REX-East Leg 1[3] (as Rockies Express Pipeline LLC (km)) | Operator | In service | 2009 |
| KM REX-East Leg 2[3] (as Rockies Express Pipeline LLC (km)) | Operator | In service | 2009 |
| Rockies Express Pipeline East Project[2] (as Rockies Express Pipeline LLC (km)) | Owner and operator | In service | 2009 |
| KM/Sempra) REX-West Project[2] (as Rockies Express Pipeline LLC (km)) | Owner and operator | In service | 2008 |
| KM REX Processing Plant Lateral[7] (as Rockies Express Pipeline LLC (km)) | Owner and operator | In service | 2007 |
| KM Rockies Express (Entrega) Phase 1 Seg 2[3] (as Rockies Express Pipeline LLC (km)) | Operator | In service | 2007 |
| KM Rockies Express (Entrega) Phase 2[3] (as Rockies Express Pipeline LLC (km)) | Operator | In service | 2007 |
| Critical Energy Reliability Link Project[8] | Owner and operator | Proposed | |
| Decatur Lateral Project[2][8] | Owner and operator | Approved | |
| Seneca Compressor Expansion Project[9] | Owner and operator | Approved | |
| Seneca Lateral Facilities Section 311 Conversion[2] | Owner and operator | ||
| Switchgrass Interconnect Project[4][10] | Owner and operator | Under construction |
References
- “PHMSA annual report data: annual gas transmission gathering 2010 present”. Pipeline and Hazardous Materials Safety Administration. Archived from the original on 8 May 2026. Retrieved 3 October 2026.
- “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “FERC eLibrary docket CP26-28”. Federal Energy Regulatory Commission. 18 November 2025. Retrieved 3 October 2026.
- “Order Issuing Certificate and Granting Abandonment, Trailblazer Conversion Project (CP22-468)”. Federal Energy Regulatory Commission. 23 October 2023. Retrieved 3 October 2026.
- “FERC eLibrary docket CP18-103”. Federal Energy Regulatory Commission. 5 March 2018. Retrieved 3 October 2026.
- “FERC eLibrary docket CP07-383”. Federal Energy Regulatory Commission. 25 April 2007. Retrieved 3 October 2026.
- “FERC: Major Pipeline Projects Pending (Onshore)”. Federal Energy Regulatory Commission. Archived from the original on 20 December 2025. Retrieved 3 October 2026.
- “FERC eLibrary docket CP14-194”. Federal Energy Regulatory Commission. 18 April 2014. Retrieved 3 October 2026.
- “Environmental Assessment Report for Rockies Express Pipeline LLC's : Sections 157.205 and 157.208, 157.210 and 157.211 – authorization to construct, own, operate, and maintain facilities under CP26-28”. Federal Energy Regulatory Commission (staff document). 20 January 2026. Retrieved 3 October 2026.