Critical Energy Reliability Link Project
From the ProvenHand pipeline wiki
Critical Energy Reliability Link Project is a natural gas pipeline expansion in Colorado, operated by Cheyenne Connector, LLC. It runs 160 miles.
| Critical Energy Reliability Link Project | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | Expansion[2] |
| Status | Proposed[2] |
| Commodity | Natural gas[2] |
| Owners and operators | |
| Operator | |
| State | Colorado[2][3] |
| FERC docket | CP25-539[1] |
| Technical information | |
| Length | 160 mi[2][3] |
| Capacity | 150 MMcf/d (FERC project list)[2][3] |
| On ProvenHand | |
| Hands listed | 0 |
Critical Energy Reliability Link Project is a natural gas pipeline expansion in Colorado, operated by Cheyenne Connector, LLC. It runs 160 miles.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Critical Energy Reliability Link Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC eLibrary docket CP25-539”. Federal Energy Regulatory Commission. 15 August 2025. Retrieved 3 October 2026.
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “FERC: Major Pipeline Projects Pending (Onshore)”. Federal Energy Regulatory Commission. Archived from the original on 20 December 2025. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.