Switchgrass Interconnect Project
From the ProvenHand pipeline wiki
Switchgrass Interconnect Project is a pipeline lateral, operated by Rockies Express Pipeline LLC. It runs 7.2 miles of 36" pipe.
| Switchgrass Interconnect Project | |
|---|---|
| General information | |
| Project type | Lateral[1] |
| Status | Under construction[2] |
| Owner and operator | |
| Counties | Colorado: Weld Wyoming: Laramie[1] |
| FERC docket | CP26-28[3] |
| Technical information | |
| Length | 7.2 mi[1] |
| Pipe size | 36"[1] |
| Capacity added | 419,000 dekatherms per day[1] |
| Cost | $57,300,000[1] |
| On ProvenHand | |
| Hands listed | 0 |
Switchgrass Interconnect Project is a pipeline lateral, operated by Rockies Express Pipeline LLC. It runs 7.2 miles of 36" pipe.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Switchgrass Interconnect Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “Environmental Assessment Report for Rockies Express Pipeline LLC's : Sections 157.205 and 157.208, 157.210 and 157.211 – authorization to construct, own, operate, and maintain facilities under CP26-28”. Federal Energy Regulatory Commission (staff document). 20 January 2026. Retrieved 3 October 2026.
- “Rockies Express Pipeline LLC submits Weekly Construction Status Report No. 30 for the period of 09/20/2026 to 09/26/2026 re the Switchgrass Interconnect Project under CP26-28.”. Rockies Express Pipeline LLC (filed with FERC). 2 October 2026. Retrieved 3 October 2026.
- “FERC eLibrary docket CP26-28”. Federal Energy Regulatory Commission. 18 November 2025. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.