Cameron Interstate Pipeline

From the ProvenHand pipeline wiki

Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.

Cameron Interstate Pipeline is a natural gas pipeline expansion in Louisiana. Construction began in 2007.[1]

Cameron Interstate Pipeline
Also calledCIP, Cameron Pipeline
General information
Project typeExpansion[2]
StatusIn service[2][3]
CommodityNatural gas[2]
OperatorSempra[4] or Cameron Interstate Pipeline, LLC[4][sources disagree]
Owner and operator
Operator
StateLouisiana[2][4]
CountiesBeauregard, Calcasieu, Cameron[5]
Approved27 June 2005[4]
Construction started30 November 2007[6]
In serviceSeptember 2008[2] or 1 November 2008[3] or November 2008[1][sources disagree]
FERC docketCP05-119[4]
Contractors
Technical information
Length36.5 mi[4][7] or 36.1 mi[2][sources disagree]
Pipe size42"[2][8]
Capacity1500 MMcf/d (FERC project list)[4] or 2350 MMcf/d additional capacity (EIA)[2][sources disagree]
Cost$115.1 million (EIA estimate; no dollar year given)[2]
On ProvenHand
Hands listed0

Cameron Interstate Pipeline is a natural gas pipeline expansion in Louisiana. Construction began in 2007.[1]

Contractorsedit

ContractorWorkPrime or subScopeSpread
Henkels & McCoy, Inc.[6][9]Primegeneral contractor for the 36.5-mile, 42-inch Cameron Interstate PipelineMainline
Laney Directional Drilling[6][9]HDD and boreUnder Henkels & McCoy, Inc.all horizontal directional drills on the pipeline, selected by the general contractorMainline
Northern Clearing, Inc.[6]Clearing and reclamationright-of-way clearing, mat bridges and matting at pipeline crossingsMainline
B.L. Key[6]concrete set-on weightsforming concrete set-on weights for the pipe at the PPG Road yardMainline

Spreads

SpreadPrime contractorDates
Mainline[6]Henkels & McCoy, Inc.from 30 November 2007

Crossings

FeatureMethodContractorDates
Intracoastal Waterway[9]HDDLaney Directional Drillingfrom 1 May 2008

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Capacity
  • 1500 MMcf/d (FERC project list)[4]
  • 2350 MMcf/d additional capacity (EIA)[2]
In service
  • September 2008[2]
  • 1 November 2008[3]
  • November 2008[1]
Length
Operator
  • Sempra[4]
  • Cameron Interstate Pipeline, LLC[4]

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Cameron Interstate Pipeline? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “Cameron Interstate Pipeline project page”. Sempra Infrastructure. Retrieved 3 October 2026.
  2. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  3. “Quarterly Status Report No. 23, Cameron Interstate Pipeline (CP05-119)”. Cameron Interstate Pipeline, LLC (filed with FERC). 28 January 2009. Retrieved 3 October 2026.
  4. “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
  5. “Letter order authorizing Cameron Interstate Pipeline to be placed in service (CP05-119, CP05-121)”. FERC. 31 October 2008. Retrieved 3 October 2026.
  6. “Construction Progress Report No. 3 (Dec 16-31, 2007), Cameron Interstate Pipeline (CP05-119)”. Cameron Interstate Pipeline, LLC (filed with FERC). 9 January 2008. Retrieved 3 October 2026.
  7. “Implementation Plan update and request to commence construction, Cameron Interstate Pipeline (CP05-119)”. Cameron Interstate Pipeline, LLC (filed with FERC). 10 September 2007. Retrieved 3 October 2026.
  8. “Order Amending Certificates, Cameron Interstate Pipeline, LLC (CP05-119, CP05-121)”. FERC. 20 December 2006. Retrieved 3 October 2026.
  9. “Record 42-Inch Bore Helps Connect LNG Terminal, Pipelines”. Underground Construction magazine. April 2009. Retrieved 3 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.