Transcontinental Gas Pipe Line Delta Lateral Project

From the ProvenHand pipeline wiki

Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.

Transcontinental Gas Pipe Line Delta Lateral Project is a natural gas pipeline lateral in Pennsylvania, operated by Transcontinental Gas Pipe Line Company, LLC.

Transcontinental Gas Pipe Line Delta Lateral Project
General information
KindPipeline project[1]
Project typeLateral[2][3]
StatusIn service[2]
CommodityNatural gas[2]
Owner and operator
StatePennsylvania[1][2]
CountiesYork[4]
Approved28 October 2009[1][4]
In service7 October 2010[2] or 1 October 2010[5][sources disagree]
FERC docketCP09-237[1]
Contractors
Technical information
Length3.4 mi[1] or 3.5 mi[2][sources disagree]
Pipe size16"[2]
Capacity208.8 MMcf/d (FERC project list)[1] or 208 MMcf/d additional capacity (EIA)[2][sources disagree]
Cost$12.5 million (EIA estimate; no dollar year given)[2]
On ProvenHand
Hands listed0

Transcontinental Gas Pipe Line Delta Lateral Project is a natural gas pipeline lateral in Pennsylvania, operated by Transcontinental Gas Pipe Line Company, LLC.

Contractorsedit

ContractorWorkScope
Henkels & McCoy, Inc.[6]PrimeNamed as the contractor in Transco's bi-weekly construction status report for March 31 to April 16, 2010 (3.42-mile, 16-inch Delta Lateral; Station 195 yard)

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Capacity
  • 208.8 MMcf/d (FERC project list)[1]
  • 208 MMcf/d additional capacity (EIA)[2]
In service
  • 7 October 2010[2]
  • 1 October 2010[5]
Length

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Transcontinental Gas Pipe Line Delta Lateral Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
  2. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  3. “FERC eLibrary docket CP09-237”. Federal Energy Regulatory Commission. 30 April 2009. Retrieved 3 October 2026.
  4. “Order Issuing Certificate, Transcontinental Gas Pipe Line Company, LLC, Delta Lateral Project (CP09-237)”. FERC (order). 28 October 2009. Retrieved 4 October 2026.
  5. “Notification of In-Service, Delta Lateral Project (CP09-237)”. Transcontinental Gas Pipe Line Company, LLC (filed with FERC). 8 October 2010. Retrieved 4 October 2026.
  6. “Bi-weekly Construction Status Report, March 31 to April 16, 2010, Delta Lateral Project (CP09-237)”. Transcontinental Gas Pipe Line Company, LLC (filed with FERC). 20 April 2010. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.