MinnCan Pipeline
From the ProvenHand pipeline wiki
Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.
MinnCan Pipeline is a crude oil pipeline in Minnesota, operated by Koch Pipeline Company, L.p.. Construction began in 2007.
| MinnCan Pipeline | |
|---|---|
| Also called | Minn-Can Project[1] |
| General information | |
| Kind | Pipeline project[2] |
| Status | In service[3] |
| Commodity | Crude oil[3][4] |
| Owner | |
| Operator | |
| State | Minnesota[2] |
| Construction started | August 2007[4] |
| Contractors | |
| Technical information | |
| Length | 150 mi[1] or 304 mi[3][4][sources disagree] |
| Pipe size | 24"[1][5] |
| Capacity | design capacity of 60,000-165,000 b/d[5] |
| Cost | $300 million (at state approval, 2007)[5] |
| On ProvenHand | |
| Hands listed | 0 |
MinnCan Pipeline is a crude oil pipeline in Minnesota, operated by Koch Pipeline Company, L.p.. Construction began in 2007.
Contractorsedit
| Contractor | Work | Scope | Years |
|---|---|---|---|
| Minnesota Limited, Inc.[4] | Prime | Contracted to install 160 miles of the 304-mile MinnCan route; construction began August 2007 | from 1 August 2007 |
| Hoover Construction Company[2] | Rock drilling and blasting | Pipeline rock drilling and blasting (Minnesota) | 1 January 2008 |
| Henkels & McCoy, Inc.[1] | Prime | Built the 150-mile 24-inch pipeline from near the Canadian border to the Koch refinery area at Minneapolis-St. Paul, with over 20 directional drills (firm's figures) | until 1 January 2008 |
| Henkels & McCoy, Inc.[6] | Prime | Credited by its drain-tile subcontractor as the contractor (as 'Henkels and McCoy Pipeline') on a Koch Pipeline project at Minneapolis, MN worked September 2007 to May 2008 |
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on MinnCan Pipeline? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “Recent Projects (Pipeline and Natural Gas)”. Henkels & McCoy, Inc. Archived from the original on 23 January 2012. Retrieved 3 October 2026.
- “2008 MinnCan Pipeline Drill & Blast (Minnesota) – Hoover Construction”. Hoover Construction Company. Retrieved 3 October 2026.
- “MinnCan Project Construction is Complete (project website)”. Minnesota Pipe Line Company / Koch Pipeline Company. Retrieved 3 October 2026.
- “About Us (Minnesota Limited, Inc.), with the MinnCan Project item”. Minnesota Limited (mnlimited.com). 2008. Archived from the original on 6 June 2009. Retrieved 6 October 2026.
- “MinnCan pipeline project gets PUC approval”. Oil & Gas Journal. 20 February 2007. Retrieved 3 October 2026.
- “Brandenburg Drainage project resume (Koch Pipeline project, Minneapolis MN, contracted by Henkels and McCoy Pipeline)”. Brandenburg Drainage, Inc. Archived from the original on 27 November 2020. Retrieved 6 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.