Minnesota Limited, Inc.

From the ProvenHand pipeline wiki

Minnesota Limited, Inc. is a pipeline contractor based in Big Lake, Minnesota.

Minnesota Limited, Inc.
Legal nameMinnesota Limited, LLC[1]
Also called
General information
Industry
TypePrivate[7]
StatusRenamed[8]
Successors
HeadquartersBig Lake, Minnesota, US[11]
RegionsMidwest, Northeast, Northern US[12]
PLCANot a PLCA member as of 3 October 2026[13]
On ProvenHand
Hands listed0

Minnesota Limited, Inc. is a pipeline contractor based in Big Lake, Minnesota.

This company article is a stub. You can help ProvenHand by expanding it.

Projects

As contractor

ProjectWorkScopeSpreadYearsProject built
Keystone XL Pipeline[14][15][16]pump station constructionKeystone XL pump stations: No. 14 (Baker, MT), No. 18 (Philip, SD) and No. 36 (Cooper, TX), and a station at Centrahoma, OK, for TC Energy under a project labor agreement1 January 2020 – 1 January 20212020
Eastern Market Access[4]PrimeListed 2017-2018 as contractor: 1,400 feet of 30-inch in Loudoun County, VA (HQ Leesburg, VA)2019
Northern Lights 2019[17]PrimeNew Prague branch line loop (about 1.6 miles of 6-inch)New Prague branch line loopfrom 13 May 20192019
Northern Lights 2019[17]PrimeAlexandria branch line loop extension (about 4.3 miles of 8-inch)Alexandria branch line loop extensionfrom 21 May 20192019
Northern Lights 2019[17]PrimeWillmar C-line extension (about 3.1 miles of 24-inch)Willmar C-line extension2019
Cedar Station Upgrade Project[6][18]PrimeListed 2018 as contractor: 7.8 miles of 20-inch looping in Dakota County, MN2018
Tri-County Bare Steel Replacement Project[19]PrimeListed 2017 as contractor: replacement and modernization of 34 miles of bare steel pipeline in Washington, Greene and Allegheny counties, PA2016–2018
Utopia Pipeline[19]PrimeListed 2017 as contractor for the first two spreads of the 12-inch UTOPIA East line (Harrison County to Fulton County, OH)2017–2018
Utopia Pipeline[4]FabricationMetering station upgrades and pipe fabrication, 2- to 12-inch, Tuscarawas County, OH (HQ Dover, OH), listed 20172017–2018
Utopia Pipeline[20]Prime80 miles of 12-inch new lay (UTOPIA) for Kinder Morgan out of Ashland, OH, approximate completion Nov. 30, 2017until 1 November 20172017–2018
Utopia Pipeline[21]Prime145 miles of new pipeline built in 2017 with subcontractors Southeast Directional Drilling and R.B. Somerville, plus re-service of 75 miles of existing line; the Detroit River HDD crossing was completed in summer 20191 January 2017 – 1 January 20192017–2018
12" Crude Oil Pipeline - Williams Cty[22]Prime2017
Detroit Access Pipeline Project[5]PrimeListed 2016-2017 as contractor: 35 miles of 16-inch in Washtenaw County, MI2017
Detroit Access Pipeline Project[23]Prime34 miles of 16-inch mainline for Wolverine Pipeline Company out of Ypsilanti, MI (pre-job listed September/October 2016)from 1 January 20162017
Ventura North A-line Capacity Replacement Project[24]Primepipeline segments (on-site contractor)from 26 June 20172017
Line 78 Pipeline Project[4]removal of existing pipelineRemoval of existing 24-inch pipeline in Will County, IL (listed 2017-2019)2015
Stanley & Beaver Lodge - Mountrail & Williams Cty[25]mechanical: station piping fabrication and installation (per the weekly reports)2011–2012
Northern Lights 2009/10 Zone EF Exp Proj[26]PrimeContracted by Northern Natural Gas to install multiple phases of the Northern Lights project, including the 2009-2010 Zone EF expansion (CP09-11), per the firm's June 2009 news itemfrom 1 January 20092010
MinnCan Pipeline[27]PrimeContracted to install 160 miles of the 304-mile MinnCan route; construction began August 2007from 1 August 20072007
Lucas 12617 New Well Project[28]well-line pipeline and aboveground appurtenances (concrete installation after hydrotest)
Tri-County Bare Steel Project, Phase II[4]PrimeListed 2017 as contractor: 8.3 miles of 20-inch in Washington County, PA
Weaver 12611 New Well Project[29]well-line pipeline and aboveground appurtenances (post-hydrotest sandblasting and painting)

Spreads

Spreads this company built as the prime contractor.

ProjectSpreadDates
Northern Lights 2019Alexandria branch line loop extension[17]from 21 May 2019
Northern Lights 2019New Prague branch line loop[17]from 13 May 2019
Northern Lights 2019Willmar C-line extension[17]

References

  1. “CenterPoint Energy Form 10-K for 2019, Exhibit 21.1 (subsidiaries)”. CenterPoint Energy, Inc. (filed with the SEC). 27 February 2020. Retrieved 6 October 2026.
  2. “Vectren EEI Financial Conference presentation, November 2018 (8-K Exhibit 99.1)”. Vectren Corporation (filed with the SEC). 9 November 2018. Retrieved 6 October 2026.
  3. “About MN Limited”. Minnesota Limited (mnlimited.com). 2020. Archived from the original on 23 October 2020. Retrieved 6 October 2026.
  4. “Ongoing Projects: Construction Underway (Pipeline News, September 2017)”. Pipeline News. September 2017. Retrieved 3 October 2026.
  5. “Ongoing Projects: Construction Underway (Pipeline News, March 2017)”. Pipeline News. March 2017. Retrieved 3 October 2026.
  6. “Ongoing Projects: Construction Underway (Pipeline News, July 2018)”. Pipeline News. July 2018. Retrieved 3 October 2026.
  7. “Vectren Corporation Form 10-K for 2011”. Vectren Corporation (filed with the SEC). 16 February 2012. Retrieved 6 October 2026.
  8. “Otis Minnesota Services | News”. Otis Minnesota Services. 27 July 2022. Retrieved 3 October 2026.
  9. “web.archive.org · Miller_Release.pdf”. Miller Pipeline. 31 March 2011. Archived from the original on 23 March 2012. Retrieved 3 October 2026.
  10. “PowerTeam Services, LLC Completes Combination with Miller Pipeline and Minnesota Limited”. Minnesota Limited (mnlimited.com). 9 April 2020. Archived from the original on 23 October 2020. Retrieved 6 October 2026.
  11. “Vectren acquires Minnesota Limited, Inc. (news release, 8-K Exhibit 99.2)”. Vectren Corporation (filed with the SEC). 31 March 2011. Retrieved 6 October 2026.
  12. “Vectren Investor Presentation, November 2017 (8-K Exhibit 99.1)”. Vectren Corporation (filed with the SEC). 3 November 2017. Retrieved 6 October 2026.
  13. “PLCA Member Directory”. Pipe Line Contractors Association. Retrieved 3 October 2026.
  14. “Blue Light Reports, November/December 2020 (pre-jobs)”. Pipeliners Local Union 798. November 2020. Retrieved 6 October 2026.
  15. “Blue Light Reports, September/October 2020”. Pipeliners Local Union 798. September 2020. Retrieved 6 October 2026.
  16. “Blue Light Reports, November/December 2021 (pre-jobs)”. Pipeliners Local Union 798. November 2021. Retrieved 6 October 2026.
  17. “Northern Lights 2019 and Rochester Expansion Projects (CP18-534) Biweekly Status Report No. 8, June 17-30, 2019”. Northern Natural Gas Company (filed with FERC). 9 July 2019. Retrieved 4 October 2026.
  18. “Upgrading Minneapolis' natural gas infrastructure”. Vermeer Corporation (Underground, Pro Tips). 22 July 2020. Retrieved 4 October 2026.
  19. “Ongoing Projects: Construction Underway (Pipeline News, May 2017)”. Pipeline News. May 2017. Retrieved 3 October 2026.
  20. “Blue Light Reports, May 2017 (pre-jobs)”. Pipeliners Local Union 798. May 2017. Retrieved 6 October 2026.
  21. “Reaming Head from First International Project on Display”. Minnesota Limited (mnlimited.com). 23 July 2020. Archived from the original on 6 August 2020. Retrieved 6 October 2026.
  22. “Hess RTF to TRT Pipeline Replacement project progress report, week ending 2017-10-09, PU-17-359”. Hess Corporation (filed with the North Dakota Public Service Commission). 10 October 2017. Retrieved 3 October 2026.
  23. “Blue Light Reports, September/October 2016 (Dalton Expansion let in two spreads)”. Pipeliners Local Union 798. September 2016. Retrieved 6 October 2026.
  24. “Ventura North A-line Capacity Replacement Project Weekly Status Report No. 1 (CP17-116)”. Northern Natural Gas Company (filed with FERC). 7 July 2017. Retrieved 4 October 2026.
  25. “Beaver Lodge project weekly construction reports, weeks of July 4 through October 21, 2011, PU-11-327”. Enbridge Pipelines (North Dakota) LLC (filed with the North Dakota Public Service Commission). 28 October 2011. Retrieved 3 October 2026.
  26. “News & Events (Minnesota Limited, Inc.), June 2009 item on the Northern Lights 2009-2010 Zone EF CP09-11 Expansion”. Minnesota Limited (mnlimited.com). June 2009. Archived from the original on 4 December 2009. Retrieved 6 October 2026.
  27. “About Us (Minnesota Limited, Inc.), with the MinnCan Project item”. Minnesota Limited (mnlimited.com). 2008. Archived from the original on 6 June 2009. Retrieved 6 October 2026.
  28. “Weekly Environmental Inspector Report Number 10 (final), Lucas 12617 New Well Project (CP20-525)”. Columbia Gas Transmission, LLC (filed with FERC). 11 February 2021. Retrieved 4 October 2026.
  29. “Weekly status report (final), Weaver New Well 12611 Project (CP20-523)”. Columbia Gas Transmission, LLC (filed with FERC). 5 February 2021. Retrieved 4 October 2026.