Tri-County Bare Steel Replacement Project

From the ProvenHand pipeline wiki

Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.

Tri-County Bare Steel Replacement Project is a natural gas pipeline replacement in Pennsylvania. Construction began in 2016 and the line entered service in 2018. It runs 34 miles of 20" pipe.

Tri-County Bare Steel Replacement Project
General information
KindPipeline project[1]
Project typeReplacement[1][2]
StatusIn service[3]
CommodityNatural gas[4]
Owner and operator
Operators
Owner
Facility project
StatePennsylvania[1]
CountiesAllegheny, Greene, Washington[1][2]
Approved1 February 2016[2][8]
Construction started6 April 2016[8]
In service10 October 2018[3]
FERC docketCP15-95[5]
Contractors
Technical information
Length34 mi[2][6]
Pipe size20"[9]
On ProvenHand
Hands listed0

Tri-County Bare Steel Replacement Project is a natural gas pipeline replacement in Pennsylvania. Construction began in 2016 and the line entered service in 2018. It runs 34 miles of 20" pipe.

Contractorsedit

ContractorWorkScope
Minnesota Limited, Inc.[1]PrimeListed 2017 as contractor: replacement and modernization of 34 miles of bare steel pipeline in Washington, Greene and Allegheny counties, PA

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Operator
  • Columbia Gas Transmission, LLC[5]
  • Columbia Pipeline Group[6]

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Tri-County Bare Steel Replacement Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “Ongoing Projects: Construction Underway (Pipeline News, May 2017)”. Pipeline News. May 2017. Retrieved 3 October 2026.
  2. “Order issuing certificate and granting abandonment, Columbia Gas Transmission, LLC (CP15-95)”. Federal Energy Regulatory Commission. 1 February 2016. Retrieved 4 October 2026.
  3. “Phase 3 Notice of Commencement of Service and Affirmative Statement, Tri-County Bare Steel Replacement Project (CP15-95)”. Columbia Gas Transmission, LLC (filed with FERC). 11 October 2018. Retrieved 4 October 2026.
  4. “Columbia Gas Transmission, LLC application, Tri-County Bare Steel Replacement Project (CP15-95)”. Columbia Gas Transmission, LLC (filed with FERC). 20 February 2015. Retrieved 4 October 2026.
  5. “FERC eLibrary docket CP15-95”. Federal Energy Regulatory Commission. 20 February 2015. Retrieved 3 October 2026.
  6. “Ongoing Projects: Construction Underway (Pipeline News, March 2017)”. Pipeline News. March 2017. Retrieved 3 October 2026.
  7. “In-service approval letter, Phase 2 of the Tri-County Bare Steel Project (CP15-95)”. Federal Energy Regulatory Commission. 2 November 2017. Retrieved 4 October 2026.
  8. “Commencement of Construction, Segment 1, Tri-County Bare Steel Replacement Project (CP15-95)”. Columbia Gas Transmission, LLC (filed with FERC). 7 April 2016. Retrieved 4 October 2026.
  9. “Environmental Assessment, Tri-County Bare Steel Replacement Project (CP15-95)”. Federal Energy Regulatory Commission. 14 September 2015. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.