Utopia Pipeline is an NGL pipeline in Ohio, operated by Kinder Morgan. Construction began in 2017 and the line entered service in 2018. It runs 270 miles of 12" pipe.[1]

Utopia Pipeline
Also calledUtopia, UTOPIA East, Kinder Morgan Utopia
General information
CommodityNGL[4]
OperatorKinder Morgan
StateOhio
Construction started2017
In serviceJanuary 2018[5]
Contractors
Technical information
Length270 mi
Pipe size12"[4]
On ProvenHand
Hands listed0

Utopia Pipeline is an NGL pipeline in Ohio, operated by Kinder Morgan. Construction began in 2017 and the line entered service in 2018. It runs 270 miles of 12" pipe.[1]

Contractorsedit

ContractorWorkPrime or subScopeYears
Minnesota Limited[4]First two spreads of the 12-inch (UTOPIA East)
Minnesota Limited, Inc.[6]Prime145 miles of new pipeline built in 2017 with subcontractors Southeast Directional Drilling and R.B. Somerville, plus re-service of 75 miles of existing line; the Detroit River HDD crossing was completed in summer 20191 January 2017 – 1 January 2019
Minnesota Limited, Inc.[4]PrimeListed 2017 as contractor for the first two spreads of the 12-inch UTOPIA East line (Harrison County to Fulton County, OH)
Minnesota Limited, Inc.[3]FabricationMetering station upgrades and pipe fabrication, 2- to 12-inch, Tuscarawas County, OH (HQ Dover, OH), listed 2017
Letourneau Enterprises LLC[3]Clearing and reclamationClearing, grubbing and matting of 4 miles of 12-inch right-of-way in Harrison County, OH (HQ Cadiz, OH), listed 2017
Minnesota Limited, Inc.[7]Prime80 miles of 12-inch new lay (UTOPIA) for Kinder Morgan out of Ashland, OH, approximate completion Nov. 30, 2017until 1 November 2017
Southeast Directional Drilling[6]HDD and boreUnder Minnesota Limited, Inc.Subcontractor to Minnesota Limited on the Utopia Pipeline (2017 construction); the Detroit River crossing was a horizontal directional drill
R.B. Somerville[6]subcontractor, role not statedUnder Minnesota Limited, Inc.Subcontractor to Minnesota Limited on the Utopia Pipeline (2017 construction)

Crossings

FeatureMethodContractor
Detroit River[6]HDDSoutheast Directional Drilling

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Utopia Pipeline? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. sec.gov · kmi-2018x10k.htm
  2. sec.gov · kmi-2016x10k.htm
  3. “Ongoing Projects: Construction Underway (Pipeline News, September 2017)”. Pipeline News. September 2017. Retrieved 3 October 2026.
  4. “Ongoing Projects: Construction Underway (Pipeline News, May 2017)”. Pipeline News. May 2017. Retrieved 3 October 2026.
  5. “Kinder Morgan Places Utopia Pipeline System in Service”. Minnesota Limited (mnlimited.com). 23 January 2018. Archived from the original on 14 April 2021. Retrieved 6 October 2026.
  6. “Reaming Head from First International Project on Display”. Minnesota Limited (mnlimited.com). 23 July 2020. Archived from the original on 6 August 2020. Retrieved 6 October 2026.
  7. “Blue Light Reports, May 2017 (pre-jobs)”. Pipeliners Local Union 798. May 2017. Retrieved 6 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.