ETC Tiger Pipeline, LLC
From the ProvenHand pipeline wiki
ETC Tiger Pipeline, LLC is a pipeline owner-operator based in Houston, Texas.
| ETC Tiger Pipeline, LLC | |
|---|---|
| Legal name | ETC TIGER PIPELINE, LLC[1] |
| General information | |
| Industry | |
| Headquarters | Houston, Texas[1] |
| PHMSA operator ID | 32467[3] |
| On ProvenHand | |
| Hands listed | 0 |
ETC Tiger Pipeline, LLC is a pipeline owner-operator based in Houston, Texas.
This company article is a stub. You can help ProvenHand by expanding it.
Pipeline systems and facilities
1 system and facility this company owned or operated, current ones first.
| System or facility | Kind | State | Role |
|---|---|---|---|
| Etc Tiger Pipeline[1] | Pipeline system | LA, TX | Operator |
Projects
As owner or operator
| Project | Role | Status | Project built |
|---|---|---|---|
| ETC Tiger Pipeline Expansion Project[2] | Owner and operator | In service | 2011 |
| Tiger Pipeline[2] | Owner and operator | In service | 2010 |
| Franklin Farms Project[3][5] | Owner and operator | Proposed | |
| Tiger Pipeline Expansion Project[5] | Owner | Proposed |
References
- “PHMSA annual report data: annual gas transmission gathering 2010 present”. Pipeline and Hazardous Materials Safety Administration. Archived from the original on 8 May 2026. Retrieved 3 October 2026.
- “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
- “FERC eLibrary docket CP26-549”. Federal Energy Regulatory Commission. 1 July 2026. Retrieved 3 October 2026.
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “Abbreviated Application for a Certificate of Public Convenience and Necessity, Franklin Farms Project (CP26-549), Volume I”. ETC Tiger Pipeline, LLC (filed with FERC). 1 July 2026. Retrieved 3 October 2026.